Chub and I crossed off some of these items today morning. The last bullet was addressed by Jon yesterday. I added a couple of new bullets.
The new power connectors will arrive next week, at which point we will install them. Note that there is no 24V Sorensen available, only 20V.
I am running a test on the 2W Mephisto for which I wanted the diagnostics connector plugged in again and Acromag channels to record them. So we set up the highly non-ideal but temporary set up shown in Attachment #1. This will be cleaned up by Monday evening latest.
update 1630 Monday 5/6: the sketchy PSL acromag setup has been disassembled.
Quote: |
- Take photos of the new setup, cabling.
- Remove the old c1susaux crate from the rack to free up space, possibly put the PSL monitoring acromag chassis there.
Test that the OSEM PD whitening switching is working for all 8 vertex optics.(verified as of 5/3/19 5pm)
- New 15V and 24V power cables with standard LIGO connectors need to be run from the Sorensenn supplies in 1X5. The chassis is currently powered by bench supplies sitting on a cart behind the rack.
All 24 new DB-37 signal cables need to be labeled.
New 96-pin DIN connectors need to be put on two ribbon cables (1Y5_80 B, 1Y5_81) in the 1X4 rack. We had to break these connectors to remove them from the back of the eurcrates.
General cleanup of any cables, etc. left around the rack. We cleaned up most things this evening.
Rename the host computer c1susaux2 --> c1susaux, and update the DNS lookup tables on chiara.
|
|