40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Message ID: 1454
Entry time: Fri Apr 3 17:20:05 2009
|
Author: |
Yoichi |
Type: |
Update |
Category: |
Locking |
Subject: |
The 3.8kHz peak seems like the DARM RSE (not 100% sure though) |
|
|
Yoichi, Kentaro,
Last night, we took several measurements of the AO path loop TFs with various offsets/demod. phases tweaked.
The first attachment shows the AO path loop TF as a function of the offset (in counts) added to the DARM error signal.
Though it is a bit crowded plot, you can see a general tendency that the peak becomes lower in height and higher in frequency as
the DARM offset goes from negative to positive. Since the peak height also depends on the arm power and it fluctuates during the measurements,
the change is not monotonic function of the offset though.
Being suspicious of the demodulation phase of the DARM error signal (AS166), we scanned it (see the second attachement).
But there is no significant change.
Note that the phase of the TF is 180 degrees different from the first attachment. This is because I changed the measurement point of the returning signal
on the CM board from TP2A to OUT2 to see POX_1I signal as well. These points should give the same signal for PO_DC except for the sign.
We also took the AO path TFs by changing the MICH offset (the third attachment). Again, there is no big change.
With the CARM locked with the PO_DC signal, we took the transfer function from the AO path actuation signal to the response of the POX_1I (4th attachment).
There is a huge 3.8kHz peak.
Finally, we measured the DARM response by exciting the ETMs differentially (the PDF attachment).
The shape of the 3.8kHz resonance looks like the DARM RSE peak.
It is speculated that somehow the DARM RSE resonance is coupled into the CARM loop. Don't know how though.
I'm now working on an Optickle simulation to get an insight into this issue. |
|
|
|
|
|
|
|
|
|
|