40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Message ID: 1453     Entry time: Fri Apr 3 14:52:38 2009
Author: Jenne 
Type: Omnistructure 
Category: PEM 
Subject: Guralp is finally back! 

After many, many "it'll be there in 2 weeks" from the Guralp people, our seismometer is finally back!

I have it plugged into the Guralp breakout box's Channel 1xyz (so I have unplugged the other Guralp).  Both of the Guralp's are currently sitting under the MC1/MC3 chamber.

Before we can have both Guralps up and running, I need to stuff the next 3 channels of the breakout box (back in the fall, I only had Caryn do 1x, 1y, 1z, and now I need 2x, 2y and 2z done with the fancy low-noise resistors), so all the gains match between the 2 sets of channels.

I'm leaving the new Guralp plugged in so we can see how it behaves for the next couple days, until I take out the breakout box for stuffing.

ELOG V3.1.3-