40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Jan 9 20:01:25 2019, Jon, Update, VAC, Second pumpdown completed Screenshot_from_2019-01-09_20-00-39.pngIMG_3088.jpg
    Reply  Thu Jan 10 10:23:46 2019, gautam, Update, VAC, overnight leak rate OvernightLeak.png
       Reply  Sat Feb 2 21:53:24 2019, Koji, Update, VAC, overnight leak rate Screen_Shot_2019-02-02_at_21.49.33.png
          Reply  Sun Feb 3 15:15:21 2019, gautam, Update, VAC, overnight leak rate Jan10_data.pngFeb1_data.png
             Reply  Sun Feb 3 20:52:34 2019, Koji, Update, VAC, overnight leak rate 
                Reply  Mon Feb 4 12:23:24 2019, gautam, Update, VAC, pumpdown 83 - leak tests PD83.png
                   Reply  Tue Feb 5 10:11:30 2019, gautam, Update, VAC, leak tests complete, pumpdown 83 resumed Annuli.pngMainVol.png
                      Reply  Tue Feb 5 19:30:14 2019, gautam, Update, VAC, Main volume at 20 uTorr PD83.png
                         Reply  Thu Feb 7 13:55:25 2019, gautam, Update, VAC, RGA turned on 
                            Reply  Thu Feb 7 19:28:46 2019, gautam, Update, VAC, IFO recovery 
Message ID: 14436     Entry time: Tue Feb 5 19:30:14 2019     In reply to: 14434     Reply to this: 14438
Author: gautam 
Type: Update 
Category: VAC 
Subject: Main volume at 20 uTorr 

Pumpdown looks healthy, so I'm leaving the TPs on overnight. At some point, we should probably get the RGA going again. I don't know that we have a "reference" RGA trace that we can compare the scan to, should check with Steve. The high power (1 W) beam has not yet been sent into the vacuum, we should probably add the interlock condition that shuts off the PSL shutter before that.

Attachment 1: PD83.png  34 kB  | Hide | Hide all
PD83.png