40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Jan 15 10:52:38 2019, gautam, Update, SUS, EY door opened 
    Reply  Tue Jan 15 15:49:47 2019, gautam, Update, SUS, EY door opened EY_OSEMs.png
       Reply  Sat Jan 19 15:33:18 2019, gautam, Update, SUS, ETMY OSEMs faulty Screen_Shot_2019-01-19_at_3.32.35_PM.pngETMY_sensors_1231832635.pdf
          Reply  Tue Jan 22 20:36:53 2019, gautam, Update, SUS, ETMY OSEMs faulty 
             Reply  Wed Jan 23 12:39:18 2019, gautam, Update, SUS, EY chamber work 6x
                Reply  Wed Jan 23 23:12:44 2019, gautam, Update, SUS, Prep for FC cleaning IY_level_before.pdf
                   Reply  Thu Jan 24 15:32:31 2019, gautam, Update, SUS, Y arm cavity side first contact applied Yarm_FC.pdfOSEMfilter.png
                      Reply  Tue Jan 29 22:12:40 2019, gautam, Update, SUS, Alignment prep 
                         Reply  Wed Jan 30 11:54:24 2019, gautam, Update, SUS, More alignment prep IMG_5958.JPGIMG_5962.JPG
                            Reply  Wed Jan 30 19:25:40 2019, gautam, Update, SUS, Xarm cavity alignment Xarm.pngXarm_IR.png
                               Reply  Fri Feb 1 01:24:06 2019, gautam, Update, SUS, Almost ready for pumpdown tomorrow 
                                  Reply  Fri Feb 1 13:16:50 2019, gautam, Update, SUS, Pumpdown 83 underway 
                                     Reply  Fri Feb 1 21:52:57 2019, gautam, Update, SUS, Pumpdown 83 underway 
                                  Reply  Fri Feb 1 14:44:14 2019, gautam, Update, SUS, Y arm FC cleaning and reinstall IMG_5974.JPGIMG_5986.JPGIMG_5992.JPG
    Reply  Wed Jan 16 16:25:25 2019, gautam, Update, SUS, Yarm locked Yarm_locked.png
       Reply  Fri Jan 18 21:34:18 2019, gautam, Update, SUS, Unused optic on EY table IMG_5408.JPG
          Reply  Sat Jan 19 05:07:45 2019, Koji, Update, SUS, Unused optic on EY table 
Message ID: 14427     Entry time: Fri Feb 1 14:44:14 2019     In reply to: 14425
Author: gautam 
Type: Update 
Category: SUS 
Subject: Y arm FC cleaning and reinstall 

[Attachment #1]: ITMY HR face after cleaning. I determined this to be sufficiently clean and re-installed the optic.

[Attachment #2]: ETMY HR face after cleaning. This is what the HR face looks like after 3 rounds of First-Contact application. After the first round, we noticed some arc-shaped lines near the center of the optic's clear aperture. We were worried this was a scratch, but we now believe it to be First-Contact residue, because we were able to remove it after drag wiping with acetone and isopropanol. However, we mistrust the quality of the solvents used - they are not any special dehydrated kind, and we are looking into acquiring some dehydrated solvents for future cleaning efforts.

[Attachment #3]: Top view of ETMY cage meant to show increased clearance between the IFO axis and the elliptical reflector.

Many more photos (including table leveling checks) on the google-photos page for this vent. The estimated time between F.C. peeling and pumpdown is ~24 hours for ITMY and ~15 hours for ETMY, but for the former, the heavy doors were put on ~1 hour after the peeling.

The first task is to fix the damping of ETMY.

Attachment 1: IMG_5974.JPG  4.065 MB  | Hide | Hide all
IMG_5974.JPG
Attachment 2: IMG_5986.JPG  2.621 MB  | Hide | Hide all
IMG_5986.JPG
Attachment 3: IMG_5992.JPG  4.548 MB  | Hide | Hide all
IMG_5992.JPG
ELOG V3.1.3-