40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Jan 15 10:52:38 2019, gautam, Update, SUS, EY door opened 
    Reply  Tue Jan 15 15:49:47 2019, gautam, Update, SUS, EY door opened EY_OSEMs.png
       Reply  Sat Jan 19 15:33:18 2019, gautam, Update, SUS, ETMY OSEMs faulty Screen_Shot_2019-01-19_at_3.32.35_PM.pngETMY_sensors_1231832635.pdf
          Reply  Tue Jan 22 20:36:53 2019, gautam, Update, SUS, ETMY OSEMs faulty 
             Reply  Wed Jan 23 12:39:18 2019, gautam, Update, SUS, EY chamber work 6x
                Reply  Wed Jan 23 23:12:44 2019, gautam, Update, SUS, Prep for FC cleaning IY_level_before.pdf
                   Reply  Thu Jan 24 15:32:31 2019, gautam, Update, SUS, Y arm cavity side first contact applied Yarm_FC.pdfOSEMfilter.png
                      Reply  Tue Jan 29 22:12:40 2019, gautam, Update, SUS, Alignment prep 
                         Reply  Wed Jan 30 11:54:24 2019, gautam, Update, SUS, More alignment prep IMG_5958.JPGIMG_5962.JPG
                            Reply  Wed Jan 30 19:25:40 2019, gautam, Update, SUS, Xarm cavity alignment Xarm.pngXarm_IR.png
                               Reply  Fri Feb 1 01:24:06 2019, gautam, Update, SUS, Almost ready for pumpdown tomorrow 
                                  Reply  Fri Feb 1 13:16:50 2019, gautam, Update, SUS, Pumpdown 83 underway 
                                     Reply  Fri Feb 1 21:52:57 2019, gautam, Update, SUS, Pumpdown 83 underway 
                                  Reply  Fri Feb 1 14:44:14 2019, gautam, Update, SUS, Y arm FC cleaning and reinstall IMG_5974.JPGIMG_5986.JPGIMG_5992.JPG
    Reply  Wed Jan 16 16:25:25 2019, gautam, Update, SUS, Yarm locked Yarm_locked.png
       Reply  Fri Jan 18 21:34:18 2019, gautam, Update, SUS, Unused optic on EY table IMG_5408.JPG
          Reply  Sat Jan 19 05:07:45 2019, Koji, Update, SUS, Unused optic on EY table 
Message ID: 14415     Entry time: Wed Jan 23 23:12:44 2019     In reply to: 14413     Reply to this: 14416
Author: gautam 
Type: Update 
Category: SUS 
Subject: Prep for FC cleaning 

In preparation for the FC cleaning, I did the following:

  1. Set up mini-cleanroom at EY - this consists of the mobile HEPA unit put up against the chamber door, with films draped around the setup.
  2. After double-checking the table leveling, I EQ-stopped ETMY and moved it to the NE corner of the EY table, where it will be cleaned.
  3. Checked leveling of IY table - see Attachment #1.
  4. Took pictures of IY table, OSEM arrangement on ITMY.
  5. EQ-stopped ITMY and SRM.
  6. Removed the face OSEMs from ITMY (this required clipping off the copper wire used to hold the OSEM wires against the suspension cage). The side OSEM has not yet been removed because I left the allen key that is compatible with that particular screw inside the EY chamber. 
  7. To position ITMY at the edge of the IY table where we can easily clean it, we will need to move the OSEM cabling tower as we did last time. I've taken photos of its current position for now.

Tomorrow, I will start with the cleaning of ETMY HR. While the FC is drying, I will position ITMY at the edge of the IY cable for cleaning (Chub will setup the mini-cleanroom at the IY table). The plan is to clean both HR surfaces and have the optics back in place by tomorrow evening. By my count, we have done everything listed in the IY and EY chambers. I'd like to minimize the time between cleaning and pumpdown, so if all goes well (Sat Box problems notwithstanding), we will check the table leveling on Friday morning, and put on the heavy doors and at least rough the main volume down to 1 torr on Friday.

Attachment 1: IY_level_before.pdf  11.627 MB  | Hide | Hide all