Tue Jan 15 10:52:38 2019, gautam, Update, SUS, EY door opened
|
Tue Jan 15 15:49:47 2019, gautam, Update, SUS, EY door opened
|
Sat Jan 19 15:33:18 2019, gautam, Update, SUS, ETMY OSEMs faulty 
|
Tue Jan 22 20:36:53 2019, gautam, Update, SUS, ETMY OSEMs faulty
|
Wed Jan 23 12:39:18 2019, gautam, Update, SUS, EY chamber work 6x
|
Wed Jan 23 23:12:44 2019, gautam, Update, SUS, Prep for FC cleaning
|
Thu Jan 24 15:32:31 2019, gautam, Update, SUS, Y arm cavity side first contact applied 
|
Tue Jan 29 22:12:40 2019, gautam, Update, SUS, Alignment prep
|
Wed Jan 30 11:54:24 2019, gautam, Update, SUS, More alignment prep 
|
Wed Jan 30 19:25:40 2019, gautam, Update, SUS, Xarm cavity alignment 
|
Fri Feb 1 01:24:06 2019, gautam, Update, SUS, Almost ready for pumpdown tomorrow
|
Fri Feb 1 13:16:50 2019, gautam, Update, SUS, Pumpdown 83 underway
|
Fri Feb 1 21:52:57 2019, gautam, Update, SUS, Pumpdown 83 underway
|
Fri Feb 1 14:44:14 2019, gautam, Update, SUS, Y arm FC cleaning and reinstall  
|
Wed Jan 16 16:25:25 2019, gautam, Update, SUS, Yarm locked
|
Fri Jan 18 21:34:18 2019, gautam, Update, SUS, Unused optic on EY table
|
Sat Jan 19 05:07:45 2019, Koji, Update, SUS, Unused optic on EY table
|
|
Message ID: 14413
Entry time: Wed Jan 23 12:39:18 2019
In reply to: 14411
Reply to this: 14415
|
Author: |
gautam |
Type: |
Update |
Category: |
SUS |
Subject: |
EY chamber work |
|
|
While Chub is making new cables for the EY satellite box...
- I removed the unused optic on the NW corner of the EY table. It is stored in a clean Al-foil lined plastic box, and will be moved to the clean hardware section of the lab (along the South arm, south of MC2 chamber).
- Checked table leveling - Attachment #1, looked good, and has been stable over the weekend.
- I moved the two oversized washers on the reflector, which I believe are only used because the screw is long and wouldn't go in all the way otherwise. As shown in Attachment #2, this reduces the risk of clipping the main IFO beam axis.
- Yesterday, I pulled up the 40m CAD drawing, and played around with a rectangular box that approximates the extents of the elliptical reflector, to see what would be a good place to put it. I chose to go ahead with Attachment #3. Also shown is the eventually realized layout. Note that we'd actually like the dimension marked ~7.6 inches to be more like 7.1 inches, so the optic is actually ~0.5 inch ahead of the second focus of the ellipse, but I think this is good enough.
- Attachment #4 shows the view of the optic as seen from the aperture on the back of the elliptical reflector. Looks good to me.
- Having positioned the reflector, I then inserted the heater into the aperture such that it is ~2/3rds the way in, which was the best position found by Annalisa last summer. I then ran 0.9 A of current through the heater for ~ 5 minutes. Attachment #5 shows the optic as seen with the FLIR with no heating, and after 5 minutes of heating. I'd say this is pretty unambiguous evidence that we are indeed heating the mirror. The gradient shown is significantly less pronounced than in Annalisa's simulations (~3K as opposed to 10K), but maybe the FLIR calibration isn't so great.
- For completeness, Attachment #6 shows the leveling of the table after this work. Nothing has chanegd significantly.
While the position of the reflector could possibly be optimized further, since we are already seeing a temperature gradient on the optic, I propose pushing on with other vent activities. I'm almost certain the current positioning places the optic closer to the second focus, and we already saw shifts of the HOM resonances with the old configuration, so I'd say we run with this and revisit if needed.
If Chub gives the Sat. Box the green flag, we will work on F.C.ing the mirrors in the evening, with the aim of closing up tomorrow/Friday.
All raw images in this elog have been uploaded to the 40m google photos. |
|
|
|
|
|
|
|
|
|
|
|