40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Jan 15 10:52:38 2019, gautam, Update, SUS, EY door opened 
    Reply  Tue Jan 15 15:49:47 2019, gautam, Update, SUS, EY door opened EY_OSEMs.png
       Reply  Sat Jan 19 15:33:18 2019, gautam, Update, SUS, ETMY OSEMs faulty Screen_Shot_2019-01-19_at_3.32.35_PM.pngETMY_sensors_1231832635.pdf
          Reply  Tue Jan 22 20:36:53 2019, gautam, Update, SUS, ETMY OSEMs faulty 
             Reply  Wed Jan 23 12:39:18 2019, gautam, Update, SUS, EY chamber work 6x
                Reply  Wed Jan 23 23:12:44 2019, gautam, Update, SUS, Prep for FC cleaning IY_level_before.pdf
                   Reply  Thu Jan 24 15:32:31 2019, gautam, Update, SUS, Y arm cavity side first contact applied Yarm_FC.pdfOSEMfilter.png
                      Reply  Tue Jan 29 22:12:40 2019, gautam, Update, SUS, Alignment prep 
                         Reply  Wed Jan 30 11:54:24 2019, gautam, Update, SUS, More alignment prep IMG_5958.JPGIMG_5962.JPG
                            Reply  Wed Jan 30 19:25:40 2019, gautam, Update, SUS, Xarm cavity alignment Xarm.pngXarm_IR.png
                               Reply  Fri Feb 1 01:24:06 2019, gautam, Update, SUS, Almost ready for pumpdown tomorrow 
                                  Reply  Fri Feb 1 13:16:50 2019, gautam, Update, SUS, Pumpdown 83 underway 
                                     Reply  Fri Feb 1 21:52:57 2019, gautam, Update, SUS, Pumpdown 83 underway 
                                  Reply  Fri Feb 1 14:44:14 2019, gautam, Update, SUS, Y arm FC cleaning and reinstall IMG_5974.JPGIMG_5986.JPGIMG_5992.JPG
    Reply  Wed Jan 16 16:25:25 2019, gautam, Update, SUS, Yarm locked Yarm_locked.png
       Reply  Fri Jan 18 21:34:18 2019, gautam, Update, SUS, Unused optic on EY table IMG_5408.JPG
          Reply  Sat Jan 19 05:07:45 2019, Koji, Update, SUS, Unused optic on EY table 
Message ID: 14399     Entry time: Tue Jan 15 10:52:38 2019     Reply to this: 14401   14403
Author: gautam 
Type: Update 
Category: SUS 
Subject: EY door opened 

[chub, bob, gautam]

We took the heavy door off the EY chamber at ~930am.

Chamber work:

  • ETMY suspension cage was returned to its nominal position.
  • Unused hardware from the annular heater setup was removed.
  • The unused heater had its leads snipped close to the heater crimp point, and the exposed part of the bare wires was covered with Kapton tape (we should remove the source leads as well in air to avoid any accidental shorting)

Waiting for the table to level off now. Plan for later today / tomorrow is as follows:

  1. Lock the Y arm, recover good cavity alignment.
  2. Position parabolic heater such that clipping issue is resolved.
  3. Move optic to edge of table for FC cleaning
  4. Clean optic
  5. Return suspension cage to nominal position.
ELOG V3.1.3-