40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Nov 21 09:59:26 2018, gautam, Update, LSC, LSC feedforward block diagram IMG_7173.JPG
    Reply  Fri Nov 30 19:37:47 2018, gautam, Update, LSC, LSC feedforward block diagram LSC_FF_tester.pngScreenshot_from_2018-11-30_19-41-07.pngScreenshot_from_2018-12-10_15-31-23.pngSimLSC.png
       Reply  Mon Dec 10 15:53:16 2018, gautam, Update, LSC, Swept-sine measurement with DTT SimTF.pdf
Message ID: 14313     Entry time: Wed Nov 21 09:59:26 2018     Reply to this: 14326
Author: gautam 
Type: Update 
Category: LSC 
Subject: LSC feedforward block diagram 

Attachment #1 is a block diagram depicting the pathway by which the vertex DOF control signals can couple into DARM (adapted from a similar diagram in Gabriele's Virgo note on the subject). I've also indicated some points where noise can couple into either loop. In general, there are sensing noises that couple in at the error point of the loop, and actuation noises that couple in at the control point. In this linear picture, each block represents a (possibly time varying) transfer function. So we can write out the node-to-node transfer functions and evaluate the various couplings.

The motivation is to see if we can first simulate with some realistic noise and time-varying couplings (and then possibly test on the realtime system) the effectiveness of the filter denoted by "FF" in canceling out the shot noise from the auxiliary loop being re-injected into the DARM loop via the DARM sensor. Does this look correct?

Attachment 1: IMG_7173.JPG  1.343 MB  | Hide | Hide all
IMG_7173.JPG
ELOG V3.1.3-