40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Sep 21 09:59:09 2018, yuki, Configuration, ASC, Y end table upgrade plan Pic_CurrentSetup_AUXYgreen.jpegModeMatchingSolution_Current.pdfModeMatchingSolution_Current_Magnified.pdfModeMatchingSolution_Optimized.pdfModeMatchingSolution_Optimized_Magnified.pdf
    Reply  Sun Sep 23 19:32:23 2018, yuki, Configuration, ASC, Y end table upgrade plan Pic_NewSetup0923_AUXYgreen.jpegModeMatchingSolution_Result.pdfModeMatchingSolution_Magnified_0923.jpgpic0923_1.jpgpic0923_2.jpg
       Reply  Mon Sep 24 11:09:05 2018, yuki, Configuration, ASC, Y end table upgrade plan pic0924_1.jpg
       Reply  Tue Sep 25 18:08:50 2018, yuki, Configuration, ASC, Y end table upgrade plan 
          Reply  Thu Sep 27 14:02:55 2018, yuki, Configuration, ASC, PZT driver board verification PZTdriverSimulationDiagram.pdfPZTdriverSimulationResult.pdfPZTdriverPerformanceCheck_ResultOUT.pdfPZTdriverPerformanceCheck_ResultMON.pdfPZTdriver.asc
             Reply  Sun Sep 30 20:14:51 2018, yuki, Configuration, ASC, QPD calibration QPDcalibrationXaxis.pdfQPDcalibrationYaxis.pdf
                Reply  Mon Oct 1 12:03:41 2018, not yuki, Configuration, ASC, PZT driver board verification 
                   Reply  Mon Oct 1 13:33:55 2018, yuki, Configuration, ASC, QPD calibration Pic_QPDcalibration.jpg
                      Reply  Tue Oct 2 18:50:53 2018, yuki, Configuration, ASC, PZT mirror calibration PZTM1calibrationCH2.pdfPZTM1calibrationCH1.pdfPZTM2calibrationCH2.pdfPZTM2calibrationCH1.pdf
                         Reply  Wed Oct 3 18:15:34 2018, yuki, Configuration, ASC, AI board improvement TF_AIboard.pdf
                            Reply  Thu Oct 4 00:44:50 2018, yuki, Configuration, ASC, AI board improvement 
                               Reply  Thu Oct 4 22:15:30 2018, yuki, Configuration, ASC, Y-end table upgrade AUXYGreenLock20180921.jpgPic_FormerSetup.jpegPic_CurrentSetup1004.jpg
                                  Reply  Fri Oct 5 00:46:17 2018, Koji, Configuration, ASC, Y-end table upgrade 
                                     Reply  Fri Oct 5 17:32:38 2018, yuki, Configuration, ASC, Y-end table upgrade 
                                        Reply  Mon Oct 8 00:46:35 2018, yuki, Configuration, ASC, Y-end table upgrade 
                                  Reply  Fri Oct 5 17:47:55 2018, gautam, Configuration, ASC, Y-end table upgrade 
                                     Reply  Fri Oct 5 22:49:22 2018, yuki, Configuration, ASC, Y-end table upgrade 
                                        Reply  Sun Oct 7 16:51:03 2018, gautam, Configuration, LSC, Yarm triggering changed 
                                           Reply  Sun Oct 7 22:30:42 2018, yuki, Configuration, LSC, Yarm Green locking was recovered Pic_NewLayout1007.jpgYendGreenModeMatching.zip
                                              Reply  Tue Oct 9 23:03:43 2018, yuki, Configuration, LSC, Yarm Green locking was recovered Pic_1Y4.jpgPic_PZTcable.jpg
                                                 Reply  Wed Oct 10 12:38:27 2018, yuki, Configuration, LSC, All hardware was installed 
          Reply  Mon Oct 1 20:39:09 2018, gautam, Configuration, ASC, c1asy 
             Reply  Mon Oct 8 18:56:52 2018, gautam, Configuration, ASC, c1asx filter coefficient file missing 
             Reply  Tue Oct 9 16:05:29 2018, gautam, Configuration, ASC, c1tst deleted, c1asy deployed. CDSoverview_ASY.png
    Reply  Wed Oct 3 14:24:40 2018, yuki, Configuration, ASC, Y end table upgrade plan 
       Reply  Mon Oct 15 20:11:56 2018, yuki, Configuration, ASC, Y end table upgrade plan 
          Reply  Wed Oct 17 20:46:24 2018, yuki, Configuration, ASC, Y end table upgrade plan 
Message ID: 14233     Entry time: Fri Oct 5 17:47:55 2018     In reply to: 14230     Reply to this: 14234
Author: gautam 
Type: Configuration 
Category: ASC 
Subject: Y-end table upgrade 

What about just copying the Xend layout? I think it has good MM (per calculations), reasonable (in)sensitivity to component positions, good Gouy phase separation, and I think it is good to have the same layout at both ends. Since the green waist has the same size and location in the doubling crystal, it should be possible to adapt the X end solution to the Yend table pretty easily I think.

Quote:

The setup I designed is here. It can bring 100% mode-matching and good separation of degrees of TEM01, however I found a probrem. The picture of setup is attached #3. You can see the reflection angle at Y7 and Y8 is not appropriate. I will consider the schematic again.