40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Dec 31 23:19:58 2013, Koji, Summary, General, linux1 RAID crash & recovery 
    Reply  Thu Jan 2 10:15:20 2014, Jamie, Summary, General, linux1 RAID crash & recovery 
    Reply  Thu Jan 2 10:50:24 2014, Steve, Update, VAC, vacuum monitor is still blank Help.pngvacation.png20131220lastRGAscan.png
       Reply  Thu Jan 2 13:35:06 2014, Koji, Update, VAC, vacuum monitor is still blank 
          Reply  Tue Jan 28 11:13:50 2014, Koji, Update, VAC, vacuum monitor is still blank 
             Reply  Tue Jan 28 16:26:40 2014, Steve, Update, VAC, vacuum computers are back without safety c1vac1_vac2areback.png
                Reply  Wed Feb 5 08:14:59 2014, Steve, Update, VAC, vacuum computers are back without safety 
       Reply  Mon Jan 13 16:50:55 2014, Steve, Update, VAC, Maglev controller needs service 
          Reply  Wed Apr 2 16:34:15 2014, Steve, Update, VAC, Maglev controller needs service 
             Reply  Thu Apr 3 17:05:52 2014, Steve, Update, VAC, Maglev controller swapped loanerControllerIn.png
                Reply  Thu Apr 10 16:09:29 2014, Steve, Update, VAC, RGA scan at 75% pumping speed 520HzpumpingSpeed.png
                   Reply  Tue May 27 11:00:43 2014, Steve, Update, VAC, RGA scan at day 111 pd77d111RGA.png
                      Reply  Thu Aug 21 15:07:48 2014, Steve, Update, VAC, RGA scan at day 197 RGAscan@d197.png
                         Reply  Mon Sep 22 15:20:32 2014, Steve, Update, VAC, RGA scan at day 229 RGA@229day.pngRGAscan229d.png
                Reply  Mon Apr 21 10:14:00 2014, Steve, Update, VAC, Maglev controller serviced ourControllerBack560Hz.png
             Reply  Wed Aug 29 09:56:00 2018, Steve, Update, VAC, Maglev controller needs service 
                Reply  Mon Oct 22 15:19:05 2018, Steve, Update, VAC, Maglev controller serviced our_controller_is_back.png
    Reply  Mon Jan 6 16:32:40 2014, Koji, Summary, General, linux1 RAID crash & recovery 
Message ID: 14189     Entry time: Wed Aug 29 09:56:00 2018     In reply to: 9776     Reply to this: 14262
Author: Steve 
Type: Update 
Category: VAC 
Subject: Maglev controller needs service 

TP-1 Osaka maglev controller  [  model TCO10M,  ser V3F04J07 ]  needs maintenance. Alarm led  on indicating  that we need Lv2 service.

The turbo and the controller are in good working order.

*****************************

Hi Steve,

Our maintenance level 2 service price is $...... It consists of a complete disassembly of the controller for internal cleaning of all ICB’s, replacement of all main board capacitors, replacement of all internal cooling units, ROM battery replacement, re-assembly, and mandatory final testing to make sure it meets our factory specifications. Turnaround time is approximately 3 weeks.

  RMA 5686 has been assigned to Caltech’s returning TC010M controller. Attached please find our RMA forms. Complete and return them to us via email, along with your PO, prior to shipping the cont

Best regards,

Pedro Gutierrez

Osaka Vacuum USA, Inc.

510-770-0100 x 109

*************************************************

our TP-1 TG390MCAB is 9 years old. What is the life expectancy of this turbo?

                        The Osaka maglev turbopumps are designed with a 100,000 hours(or ~ 10 operating years) life span but as you know most of our end-users are

                        running their Osaka maglev turbopumps in excess of 10+, 15+ years continuously.     The 100,000 hours design value is based upon the AL material being rotated at

                        the given speed.   But the design fudge factor have somehow elongated the practical life span.  

We should have the cost of new maglev & controller in next year budget. I  put the quote into the wiki.

 

                         

 