Entry  Fri Aug 10 11:29:39 2018, aaron, Configuration, Upgrade, Parts list for BHD 
    Reply  Fri Aug 10 16:43:50 2018, gautam, Configuration, Upgrade, Parts list for BHD 
       Reply  Sun Aug 12 10:59:34 2018, aaron, Configuration, Upgrade, Parts list for BHD 
          Reply  Mon Aug 13 17:20:07 2018, aaron, Configuration, Upgrade, Parts list for BHD BHD_layout.pdf
Message ID: 14153     Entry time: Fri Aug 10 11:29:39 2018     Reply to this: 14154
Author: aaron 
Type: Configuration 
Category: Upgrade 
Subject: Parts list for BHD 

I've started putting together a list of things we'll need to buy to do BHD readout. I'm still messing around with more detailed optics layouts, but wanted to get a list started here so people can let me know if I'm missing any big, obvious categories of goods.

My current plan makes minimal changes to the signal path going to the OMC, and tries to just get the LO beam into the OMC with minimal optics. I'm not thinking of any of the optics as suspended, and it requires several reflections of the LO beam, so probably this is not an excellent configuration, but it's a start for getting the parts list:

  1. My current thought is to use the MC reflection, the beam that heads from MC1 to MCR1, as the LO beam
    1. From MCR1, send the LO to a BS that directs it into an MMT, oriented along x (and lets us keep the MC refl PO)
    2. After the two MMT optics, the beam will be traveling along -x, and can be directed to a mirror that sends it towards -y to two steering mirrors that send it along -x then +x near the top of the table (perpendicular to the signal MMT.
    3. Then, send it to a PBS, which replaces the mirror directly after the signal MMT. This is where it combines 
  2. Beam is then sent to the steering mirrors to bring it into the OMC
  3. In parallel, the signal beam is going through the same path it has now, including the pickoff beam, with the one change that we need a HWP somewhere before the PBS, and the PBS replaces the mirror directly after the MMT (and needs to move a bit closer to have the beam properly directed)

I started making a layout of this scheme, but it's probably not going to work so I'm going to make a quick layout of this more major modification instead:

  1. Both the MCR beam and the AS beam come in about parallel. Send each to a PO mirror.
  2. The PO mirror directs both beams into parallel MMT aligned along x
  3. From the MMT, each is directed to a pair of steering mirrors located where the OMC MMT is located now
  4. From the steering mirrors go to the PBS that combines the signal and LO
  5. Then to two more steering mirrors to get into the OMC, which may be moved towards +x
  6. From the OMC go to the BHD PBS

What we need

Optics

  • HWP for just before the LO combines with the signal
  • HWP for just before the signal combines with the LO (is this necessary?)
  • PBS to replace OM5 (combines the LO and the signal)
  • Two MMT optics
  • Two piezo-driven TT optics for steering the LO to the PBS
  • One additional non-piezo optic for between the LOMMT and the LO-TTs
  • One additional BS to get the LO into the MMT (and to let us still have the PO)
  • -1 optic—we pick up one mirror that we replace with the PBS

Optomechanics

  • 2x HWP mounts
  • 1x PBS mount
  • 2x mounts for piezo-driven TT
  • 2x MMT optic mounts—I didn’t take a close enough look at these during the vent to know what we need here
  • 2x mounts for ordinary optics
  • 9x clamps for optics mounts (maybe fewer if some are on blocks)
  • 9x posts for optics mounts

Electronics

  • Additional TT driver
  • HV supply for the new TTs
  • Are the HWP actively controlled? We might need something to drive those?
  • Do we have enough DAC/ADC channels?

Questions

These are mostly just miscellaneous

  1. What of these optics need to be suspended? If we need suspensions on all of the LO optics, including the MMT, I’m not sure we’re going to be able to fit all of this on the table as I envision it…..
  2. What if anything can we put out of vacuum (HWP for example)?
  3. Do we actually need two MMT?