Entry  Thu Aug 9 02:12:13 2018, gautam, Update, COC, South East or West? 
    Reply  Wed Aug 15 12:15:24 2018, gautam, Update, COC, Macroscopic SRC length for SR tuning SRC_MCMC_shortTerm.pdfSRC_dists_shortTerm.pdf
Message ID: 14148     Entry time: Thu Aug 9 02:12:13 2018     Reply to this: 14164
Author: gautam 
Type: Update 
Category: COC 
Subject: South East or West? 

Summary:

For operating the SRC in the "Signal-Recycled" tuning, the SRC macroscopic length needs to be ~4.04m (compared to the current value of ~5.399m), assuming we don't do anything fancy like change the modulation frequencies and not transmit through the IMC. We're putting together a notebook with all the calculations, but today I was thinking about what the signal extraction path should be, specifically which chamber the SRM should be in. Just noting down the thoughts I had here while they're fresh in my head, all this has to be fleshed out, maybe I'm making this out to be more of a problem than it actually is.

Details:

  • For the current modulation frequencies, if we want the reosnance conditions such that the f2 sideband is resonant in the SRC (but not f1, i.e. small Schnupp asymmetry regime) while the carrier is resonant in the arms (required for good sensing of the SRC length), the macroscopic length of the SRC needs to be changed to ~4.04m.
  • Practically, this means that the folded SRC would only have one folding mirror (SR2).
  • There is a shorter SRC length of ~1.something metres which would work, but that would involve changing the relative position between ITMs and BS (currently ~2.3m) so I reject that option for now.
  • So the SR2 would be roughly where it is right now, ~20cm from the BS.
  • The question then becomes, where do we direct the reflection from the SR2? We need an optical path length of ~1.5m from SR2. So options are 
    • ITMY table (East)
    • ITMX table (South)
    • IMC table (West)
  • Moreover, after the SRM, we have to accommodate:
    • Some kind of pickoff for in-air PDs.
    • OFI.
    • OMC MMT.
    • OMC.
  • Some kind of CBA (as of now I think going to the ITMY table is the best option):
Option Advantages Disadvantages
ITMY
  • Easy to direct beam from BS/PRM chamber to the ITMY table (i.e. we don't have to worry too much about avoiding other optics in the path etc).
  • Ease of access to chamber, ease of working in there.
  • ITMY table probably has the most room to work out an OFI + OMC MMT + OMC solution.
  • AS beam extraction to air will be more complicated, possibly have to do it on ITMY optical table.
  • Not sure if the ITMY table can accommodate all of the output optics subsystems I listed above.
  • Routing the LO beam to this table would be tricky I guess.
ITMX
  • Routing the LO beam for homodyne detection is probably easiest in this chamber.
  • Allows for small AoI on folding mirror, reducing the impact of astigmatism.
  • Pain to work in this chamber because of IMC tube.
  • Steering beam from SR2 to ITMX table means threading the needle between PRM and PR3 possibly.
IMC
  • Probably allows the use of (almost) the entire existing OMC chamber for the output optics (OFI, OMC MMT, OMC).
  • IMC table is crowded (2 SOS towers, several steering optics for the input beam, input faraday).
  • Not sure what is the performance of the seismic isolation stacks on these tables vs the larger optical tables.
  • Painful to work in these smaller chambers.