Entry  Tue Jul 17 12:55:45 2018, Koji, Summary, General, Started pumping 6x
    Reply  Tue Jul 17 18:16:38 2018, Steve, Summary, VAC, pumpdown 81 at 6 hrs 6x
       Reply  Tue Jul 17 22:25:41 2018, Koji, Summary, VAC, pumpdown 81 at 6 hrs 
          Reply  Wed Jul 18 12:49:08 2018, Steve, Summary, VAC, pumpdown 81 at 6 +4.5hrs manlGateScan.pnghanding_over_Mag.pngTGVw2auxfans_.jpg
             Reply  Wed Jul 18 17:36:50 2018, Steve, Summary, VAC, pumpdown 81 at 6 +9 hrs completed pd81completed.pngpd81@30hrs.png
                Reply  Thu Jul 19 01:56:25 2018, gautam, Summary, VAC, AUX pump shutdown 
                   Reply  Thu Jul 19 11:01:03 2018, Steve, Summary, VAC, pd81 @ 2e-5 Torr pd81@2days.png
                      Reply  Thu Jul 19 13:35:30 2018, Steve, Summary, VAC, annuloses pumped  AnsPumped.png
                         Reply  Mon Jul 23 09:58:52 2018, Steve, Summary, VAC, RGA scan at day 6 pd81-560Hz-d6.png
                            Reply  Mon Aug 6 09:34:02 2018, Steve, Update, VAC, RGA scan at day 20 pd81d20.png
                               Reply  Thu Aug 16 07:50:28 2018, Steve, Update, VAC, pumpdown 81 at day 30 pd81d30.png
                                  Reply  Thu Aug 16 14:48:14 2018, Steve, Update, VAC, why do we need a root pump? 6x
                                     Reply  Fri Nov 16 10:26:12 2018, Steve, Update, VAC, single viton O-rings Single-O-ring.png
                                  Reply  Fri Aug 24 10:51:23 2018, Steve, Update, VAC, pumpdown 81 at day 38 d38.png
                                     Reply  Thu Oct 4 08:25:50 2018, Steve, Update, VAC, rga scan pd81 at day 78 pd81d78.png
                                        Reply  Fri Oct 12 08:27:05 2018, Steve, Update, VAC, drypump forepump.png
                                           Reply  Fri Oct 12 17:37:03 2018, Steve, Update, VAC, pressure gauge choices  
                                           Reply  Mon Oct 15 13:59:42 2018, Steve, Update, VAC, drypump replaced drypump_swap.png
                                        Reply  Tue Nov 13 16:15:01 2018, Steve, Update, VAC, rga scan pd81 at day 119 pd81-d119.pngpd81-560Hz-d119.png
Message ID: 14082     Entry time: Wed Jul 18 12:49:08 2018     In reply to: 14080     Reply to this: 14083
Author: Steve 
Type: Summary 
Category: VAC 
Subject: pumpdown 81 at 6 +4.5hrs 

The manual gate valve scan was clean. Atm1     TP1 was pumping on it overnight.

                                                Pumpdown continued to hand over the pumping to TP1 maglev turbo

V1 was opened at P1 400 mTorr  with manual gate at 3/4 turn open position as Magev at 560 Hz rotation.

Two aux fans on to hold tubo temps TP1 & TP3 . Atm3

This is the first time we pumping down from atm with ONE small "beer can" turbo  and throttled gate valve to control load on small turbo forepump

The 70 l/s turbo is operating at 50k RPM, 0.7 A and 31 C,  pumping speed  ~ 44 mTorr/h at 200-400 mTorr range with aux drypump in the foreline of TP3

Watching foreline pressures and current one can keep opening gate valve little by little the so the load is optimized. It is working but not fast.

Let's keep small turbo at 0.8 Amp and 32 C max at this pumpdown. 

Quote:

10:20PM

  • Opened VM2 to pump down the RGA section with TP1
  • Stopped rotary roughing pumps
    • Manually closed RV1
    • Closed V3
    • Stopped RP1 and RP3
    • Vented the RP hose

The P1 pressure is 380mTorr. I allowed Gautam to use the full PSL power (~1W).

Attachment 1: manlGateScan.png  115 kB  Uploaded Wed Jul 18 13:50:06 2018  | Hide | Hide all | Show all
manlGateScan.png
Attachment 2: handing_over_Mag.png  57 kB  Uploaded Wed Jul 18 13:51:11 2018  | Show | Hide all | Show all
Attachment 3: TGVw2auxfans_.jpg  3.873 MB  Uploaded Thu Jul 19 11:52:30 2018  | Hide | Hide all | Show all
TGVw2auxfans_.jpg
ELOG V3.1.3-