40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Sun Apr 29 22:53:06 2018, gautam, Update, General, DARM actuation estimate darmEst.pdf
    Reply  Tue May 1 19:37:50 2018, gautam, Update, General, DARM actuation estimate darmEst.pdfdarmEst_time.pdf
       Reply  Mon May 7 16:23:06 2018, gautam, Update, General, DARM actuation estimate darmProj.pdf37.pngMCalign_20180507.png
          Reply  Mon May 7 20:01:14 2018, Rorpheus, Update, General, Use anti-dewhitening + show CARMA/DARMA 
             Reply  Thu May 10 14:13:22 2018, gautam, Update, General, More refinement of DARM control signal projection darmProj.pdfdarmOLTF.pdfDWcomparison.pdf
                Reply  Fri May 11 13:58:42 2018, rana, Update, General, More refinement of DARM control signal projection 
                   Reply  Fri May 11 19:02:52 2018, gautam, Update, General, More refinement of DARM control signal projection darmProj.pdfdarmOLTF.pdfDWcomparison.pdfDARMsuppression.pdfControlLoop.pdf
                      Reply  Sat May 12 10:02:03 2018, rana, Update, General, More refinement of DARM control signal projection 
                         Reply  Sun May 20 17:43:01 2018, rana, Update, Electronics, How to choose resistors 
                      Reply  Mon May 14 18:58:32 2018, Kevin, Update, PonderSqueeze, Squeezing with no SRM homodyne_heatmap.pdfdisplacement_noise.pdfnoise_budget.pdf
                         Reply  Tue Oct 2 23:57:16 2018, gautam, Update, PonderSqueeze, Squeezing scenarios PonderSqueeze_NB_LORIN.pdf
                   Reply  Tue May 15 21:56:57 2018, gautam, Update, General, Stack measurement setup decommissioned 
                      Reply  Thu May 17 09:14:38 2018, Steve, Update, General, Stack measurement setup decommissioned Load_Cell_Measurement_Set_Up.jpgETMX_stack_up_down.png
Message ID: 13851     Entry time: Thu May 17 09:14:38 2018     In reply to: 13846
Author: Steve 
Type: Update 
Category: General 
Subject: Stack measurement setup decommissioned 

The final set-up of stack measurment with 3 load cells and 4 leveling wedge mounts as Atm 1

Sensor voltages BEFORE and AFTER this attempt.

Attachment 1: Load_Cell_Measurement_Set_Up.jpg  1.596 MB  Uploaded Thu May 17 10:15:28 2018  | Hide | Hide all
Load_Cell_Measurement_Set_Up.jpg
Attachment 2: ETMX_stack_up_down.png  55 kB  Uploaded Thu May 17 10:20:21 2018  | Hide | Hide all
ETMX_stack_up_down.png
ELOG V3.1.3-