40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue May 8 11:41:16 2018, gautam, Update, General, IFO maintenance ITMX_stuck.png
    Reply  Wed May 9 17:30:04 2018, gautam, Update, General, Input beam misaligned InputBeamGone.pngTTpointing.png
       Reply  Wed May 9 19:51:07 2018, gautam, Update, General, Input beam misaligned DACweirdness.pngDACerror.png
          Reply  Sun May 13 15:15:18 2018, gautam, Update, General, CDS crash vertexFEs_crashed.png
             Reply  Sun May 13 17:31:51 2018, gautam, Update, General, CDS crash CDS_overview_20180513.pngAS_1210293643.jpeg
                Reply  Sun May 13 20:48:38 2018, johannes, Update, General, CDS crash 
                Reply  Thu May 17 11:56:37 2018, gautam, Update, General, EPICS process died on c1ioo 
                   Reply  Thu May 24 10:16:29 2018, gautam, Update, General, All models on c1lsc frontend crashed c1lsc_crashed.png
    Reply  Thu May 10 08:45:16 2018, Steve, Update, General, 4.5M eq. Cabazon, CA Cabazon4.5m79m.png4.5Meq.png
       Reply  Thu May 10 11:38:19 2018, gautam, Update, General, ITMY UL ITMY_UL.pdf
       Reply  Wed Aug 22 08:44:09 2018, Steve, Update, General, earth quake yesterday_EQs.png
          Reply  Fri Aug 24 08:04:37 2018, Steve, Update, General, small earth quake small_EQ.png
             Reply  Mon Aug 27 09:14:45 2018, Steve, Update, PEM, small earth quakes  small_EQs_vs_SUSs.png
                Reply  Tue Nov 27 10:50:20 2018, Steve, Update, PEM, earth quake Mexico 5.5M.Mexico.png
                   Reply  Thu Nov 29 08:13:33 2018, Steve, Update, PEM, EQ 3.9m So CA 3.9mSoCA.pngVac_as_today.pngas_is.png
          Reply  Wed Aug 29 09:20:27 2018, Steve, Update, SUS, local 4.4M earth quake 4.4_La_Verne.png3.4_&_4.4M_EQ.png
             Reply  Wed Aug 29 11:46:27 2018, Jon, Update, SUS, local 4.4M earth quake 
             Reply  Thu Sep 20 08:17:14 2018, Steve, Update, SUS, local 3.4M earth quake local_3.4M.png
Message ID: 13826     Entry time: Tue May 8 11:41:16 2018     Reply to this: 13827   13829
Author: gautam 
Type: Update 
Category: General 
Subject: IFO maintenance 

There was an earthquake, all watchdogs were tripped, ITMX was stuck, and c1psl was dead so MCautolocker was stuck.

Watchdogs were reset (except ETMX which remains shutdown until we finish with the stack weight measurement), ITMX was unstuck using the usual jiggling technique, and the c1psl crate was keyed.

Attachment 1: ITMX_stuck.png  35 kB  Uploaded Tue May 8 13:02:58 2018  | Hide | Hide all
ITMX_stuck.png
ELOG V3.1.3-