40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Tue Dec 26 17:24:24 2017, Steve, Update, General, power outage
|
Thu Dec 28 17:22:02 2017, gautam, Update, General, power outage - CDS recovery
|
Thu Jan 4 14:39:50 2018, gautam, Update, General, power outage - timing error
|
Fri Jan 5 21:54:28 2018, rana, Update, General, power outage - timing error
|
Fri Jan 5 22:19:53 2018, gautam, Update, General, power outage - timing error
|
Sat Jan 6 18:27:37 2018, gautam, Update, General, power outage - IFO recovery 
|
Mon Apr 16 22:09:53 2018, Kevin, Update, General, power outage - BLRM recovery 
|
Tue Apr 17 09:57:09 2018, Steve, Update, General, seismometer interfaces 
|
Wed Apr 18 20:33:19 2018, Kevin, Update, General, seismometer interfaces  
|
Fri Apr 20 23:36:28 2018, Kevin, Update, PEM, Seismometer BLRMs  
|
Tue Apr 24 21:19:08 2018, Kevin, Update, PEM, Seismometer BLRMs   
|
Wed Apr 25 17:44:39 2018, Arnold, Update, PEM, PEM Anti-Alias wiring
|
Thu Apr 26 09:35:49 2018, Kevin, Update, PEM, PEM Anti-Alias wiring 
|
Thu Apr 26 20:22:21 2018, Kevin, Update, PEM, ADC common mode rejection with new seismometer connections 
|
Wed May 16 21:02:22 2018, Kevin, Update, PEM, ADC common mode rejection with new seismometer connections
|
Thu Jun 14 15:24:32 2018, Steve, Update, PEM, ADC DAC In Line Test Boards are in
|
Tue Jan 2 15:43:35 2018, Steve, Update, VAC, pumpdown after power outage
|
Wed Feb 7 15:50:42 2018, Steve, Update, VAC, IFO pressure monitoring
|
|
Message ID: 13787
Entry time: Tue Apr 24 21:19:08 2018
In reply to: 13777
Reply to this: 13788
|
Author: |
Kevin |
Type: |
Update |
Category: |
PEM |
Subject: |
Seismometer BLRMs |
|
|
In the ongoing attempt to recover the seismometer BLRMS, I removed the AA board from the rack and modified the BS seismometer Z channel. The BS_Z BLRMs seem to be recovered after this modification.
I removed the three resistors from the output of the circuit and wired the input and from the seismometer directly to the input to the ADC. The modified schematic is shown in attachment 1. Attachments 2 and 3 show the top and bottom of the modified board. The board is doing nothing now other than serving as a connector for this channel.
I put the board back in the rack and injected a 2 Vpp signal into the BS_Z channel and saw +/- 1600 cts in C1PEM-SEIS_BS_Z. I then plugged the seismometer back into the board and took the spectrum shown in attachment 4. This shows the working Z channel giving a reasonable seismic spectrum. Note that X and Y are not modified yet.
If there are no objections, I will modify all the other channels on the board in the same way tomorrow. |
|
|
|
|
|
|