Because of the network interference we've had from the CLIO system for the past 3-4 days, I asked the guys to remove
the test stand from the 40m lab area. It is now in the 40m control room. Since it needed an ethernet connection to get out
for some reason we've let them hook into GC. Also, instead of using a real timing signal slaved to the GPS, Jay suggested
just skipping it and having the Timing Slave talk to itself by looping back the fiber with the timing signal. Osamu will enter
more details, but this is just to give a status update. |