40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Tue Dec 26 17:24:24 2017, Steve, Update, General, power outage powerOutage.png
    Reply  Thu Dec 28 17:22:02 2017, gautam, Update, General, power outage - CDS recovery 28.png
       Reply  Thu Jan 4 14:39:50 2018, gautam, Update, General, power outage - timing error 
          Reply  Fri Jan 5 21:54:28 2018, rana, Update, General, power outage - timing error huh.png
             Reply  Fri Jan 5 22:19:53 2018, gautam, Update, General, power outage - timing error 
                Reply  Sat Jan 6 18:27:37 2018, gautam, Update, General, power outage - IFO recovery EX_QPD_Quad1_Faulty.pdfTrillium_faulty.pdf
                   Reply  Mon Apr 16 22:09:53 2018, Kevin, Update, General, power outage - BLRM recovery AA.jpgADC.jpg
                      Reply  Tue Apr 17 09:57:09 2018, Steve, Update, General, seismometer interfaces BS_Tril_Intrf-1X5.jpgGurs_Intf-1X1.jpg
                         Reply  Wed Apr 18 20:33:19 2018, Kevin, Update, General, seismometer interfaces front.jpgback.jpgconnectors.jpg
                            Reply  Fri Apr 20 23:36:28 2018, Kevin, Update, PEM, Seismometer BLRMs front.jpgback.jpgdetail.jpg
                               Reply  Tue Apr 24 21:19:08 2018, Kevin, Update, PEM, Seismometer BLRMs modified_schematic.pdftop.jpgbottom.jpgBS_Seis_PSD.pdf
                                  Reply  Wed Apr 25 17:44:39 2018, Arnold, Update, PEM, PEM Anti-Alias wiring 
                                     Reply  Thu Apr 26 09:35:49 2018, Kevin, Update, PEM, PEM Anti-Alias wiring board.jpgSeismometerPSD.pdf
                                        Reply  Thu Apr 26 20:22:21 2018, Kevin, Update, PEM, ADC common mode rejection with new seismometer connections setup.pdfseismometerASD.pdf
                                           Reply  Wed May 16 21:02:22 2018, Kevin, Update, PEM, ADC common mode rejection with new seismometer connections ADC_noise.pdf
                                        Reply  Thu Jun 14 15:24:32 2018, Steve, Update, PEM, ADC DAC In Line Test Boards are in ADC_DAC_in_(1).JPG
    Reply  Tue Jan 2 15:43:35 2018, Steve, Update, VAC, pumpdown after power outage pumpdown_from_44_mTorr.png
       Reply  Wed Feb 7 15:50:42 2018, Steve, Update, VAC, IFO pressure monitoring CC_analog.png
Message ID: 13763     Entry time: Wed Apr 18 20:33:19 2018     In reply to: 13756     Reply to this: 13777
Author: Kevin 
Type: Update 
Category: General 
Subject: seismometer interfaces 

Steve, the pictures you posted are not the AA board I was referring to. The attached pictures show the board which is sitting beneath the GPS time server.

Attachment 1: front.jpg  1.798 MB  Uploaded Wed Apr 18 22:30:01 2018  | Hide | Hide all | Show all
front.jpg
Attachment 2: back.jpg  1.492 MB  Uploaded Wed Apr 18 22:30:11 2018  | Hide | Hide all | Show all
back.jpg
Attachment 3: connectors.jpg  1.088 MB  Uploaded Wed Apr 18 22:30:18 2018  | Show | Hide all | Show all
ELOG V3.1.3-