Thu Jan 4 12:46:27 2018, gautam, Update, ALS, Fiber ALS assay 
|
Thu Jan 11 14:22:40 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 11 20:51:20 2018, gautam, Update, ALS, Fiber ALS assay
|
Tue Jan 16 21:50:53 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 18 00:35:00 2018, gautam, Update, ALS, Fiber ALS assay 
|
Fri Jan 19 11:34:21 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 19 23:04:11 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 00:33:31 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 10:45:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 25 23:59:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 26 20:03:09 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 15:45:22 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 16:29:42 2018, gautam, Update, ALS, Modulation depths 
|
Wed Jan 31 16:33:53 2018, gautam, Update, ALS, ALS electronics at LSC rack
|
Wed Jan 31 22:32:11 2018, gautam, Update, ALS, ALS signal chain + power budget 
|
Thu Feb 1 01:24:56 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 00:26:34 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 13:16:55 2018, gautam, Update, ALS, ALS signals whitening switching 
|
Mon Feb 5 14:11:01 2018, gautam, Update, ALS, Huge harmonics in ALS channels 
|
Mon Feb 5 22:57:28 2018, gautam, Update, ALS, Huge harmonics in ALS channels
|
Tue Feb 6 11:13:26 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Tue Feb 6 22:55:51 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Thu Feb 8 00:33:20 2018, gautam, Update, ALS, D990694 characterization / THD measurement plan
|
Thu Feb 8 01:27:16 2018, Koji, Update, ALS, D990694 characterization / THD measurement plan
|
Fri Feb 9 13:37:44 2018, gautam, Update, ALS, THD measurement trial
|
Thu Feb 8 12:00:09 2018, gautam, Update, ALS, D990694 is NOT differential receiving
|
Thu Feb 8 13:13:14 2018, gautam, Update, ALS, D990694 pulled out  
|
Thu Feb 8 18:10:36 2018, gautam, Update, ALS, D990694 pulled out
|
Wed Feb 7 15:51:15 2018, gautam, Update, ALS, D0902745 revamp complete
|
Fri Feb 16 01:34:40 2018, gautam, Update, ALS, D0902745 in-situ testing 
|
Tue Feb 20 23:08:27 2018, gautam, Update, ALS, D0902745 in-situ testing
|
Thu Feb 22 00:09:11 2018, gautam, Update, ALS, D0902745 in-situ testing  
|
Sun Feb 25 00:03:12 2018, gautam, Update, ALS, Daughter board prototyping    
|
Mon Feb 26 20:55:56 2018, rana, Update, ALS, Daughter board prototyping
|
Tue Feb 27 21:10:45 2018, gautam, Update, ALS, Daughter board testing  
|
Wed Feb 28 19:13:25 2018, gautam, Update, ALS, ADC test for differential receiving in c1lsc
|
Fri Mar 2 01:45:06 2018, gautam, Update, ALS, new look ALS electronics
|
Mon Mar 5 17:27:34 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 00:40:25 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 19:38:37 2018, gautam, Update, ALS, digital unwhitening of daughter board
|
Thu Mar 8 23:50:27 2018, gautam, Update, ALS, First look at new ALS electronics
|
Fri Mar 9 01:07:01 2018, gautam, Update, ALS, First look at new ALS electronics
|
Mon Mar 12 22:08:31 2018, gautam, Update, ALS, Noisy POX
|
Mon Mar 12 23:57:31 2018, gautam, Update, ALS, Noisy POX 
|
Mon Mar 19 15:02:29 2018, gautam, Update, ALS, Noisy MC sensing
|
Thu Feb 1 15:31:12 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Wed Feb 7 10:16:26 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Thu Jan 25 13:18:41 2018, gautam, Update, ALS, Fiber ALS assay
|
|
Message ID: 13597
Entry time: Thu Feb 1 15:31:12 2018
In reply to: 13595
|
Author: |
gautam |
Type: |
Update |
Category: |
ALS |
Subject: |
ALS signal chain + power budget |
|
|
Summary:
A reasonable level of RF beatnote power for operating within the specs of the demod board is 17dBm arriving at the input to the power splitter just before the delay line.
Details:
Stuff is beginning to look clearer now that I've done some initial characterization of the demod boards. I will upload a more detailed report of the characterization on the DCC page, but important findings are:
- The overall conversion factor from RF to IF is ~2.3V IF per volt of RF.
- 50ohm source connected to RF input of demod board, level = 10dBm on Marconi screen, consistent with inferred value from RF mon output.
- LO driven at 14dBm by Fluke function generator.
- The ratio was calculated for IF voltage input into a High-Z load.
- So let's say we want to run at half the ADC full range of 10Vpp into the whitening board - this means we need to keep the RF input to <=11dBm.
- The Teledyne amplifier has a rated maximum input voltage of 17dBm. If we want to stay 3dB below this, we can send in 14dBm into the LO input of the demod board, which is what my characterizations were done with.
The delay line has a loss of ~3dB. The power splitter has a loss of 3dB. So putting everything together, 17dBm at the input of the power splitter gives us just the right amount of RF power to have the LO input driven at 14dBm, and the IF output be ~5Vpp into a High-Z load, which is about half the ADC full range.
|