Thu Jan 4 12:46:27 2018, gautam, Update, ALS, Fiber ALS assay 
|
Thu Jan 11 14:22:40 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 11 20:51:20 2018, gautam, Update, ALS, Fiber ALS assay
|
Tue Jan 16 21:50:53 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 18 00:35:00 2018, gautam, Update, ALS, Fiber ALS assay 
|
Fri Jan 19 11:34:21 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 19 23:04:11 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 00:33:31 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 10:45:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 25 23:59:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 26 20:03:09 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 15:45:22 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 16:29:42 2018, gautam, Update, ALS, Modulation depths 
|
Wed Jan 31 16:33:53 2018, gautam, Update, ALS, ALS electronics at LSC rack
|
Wed Jan 31 22:32:11 2018, gautam, Update, ALS, ALS signal chain + power budget 
|
Thu Feb 1 01:24:56 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 00:26:34 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 13:16:55 2018, gautam, Update, ALS, ALS signals whitening switching 
|
Mon Feb 5 14:11:01 2018, gautam, Update, ALS, Huge harmonics in ALS channels 
|
Mon Feb 5 22:57:28 2018, gautam, Update, ALS, Huge harmonics in ALS channels
|
Tue Feb 6 11:13:26 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Tue Feb 6 22:55:51 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Thu Feb 8 00:33:20 2018, gautam, Update, ALS, D990694 characterization / THD measurement plan
|
Thu Feb 8 01:27:16 2018, Koji, Update, ALS, D990694 characterization / THD measurement plan
|
Fri Feb 9 13:37:44 2018, gautam, Update, ALS, THD measurement trial
|
Thu Feb 8 12:00:09 2018, gautam, Update, ALS, D990694 is NOT differential receiving
|
Thu Feb 8 13:13:14 2018, gautam, Update, ALS, D990694 pulled out  
|
Thu Feb 8 18:10:36 2018, gautam, Update, ALS, D990694 pulled out
|
Wed Feb 7 15:51:15 2018, gautam, Update, ALS, D0902745 revamp complete
|
Fri Feb 16 01:34:40 2018, gautam, Update, ALS, D0902745 in-situ testing 
|
Tue Feb 20 23:08:27 2018, gautam, Update, ALS, D0902745 in-situ testing
|
Thu Feb 22 00:09:11 2018, gautam, Update, ALS, D0902745 in-situ testing  
|
Sun Feb 25 00:03:12 2018, gautam, Update, ALS, Daughter board prototyping    
|
Mon Feb 26 20:55:56 2018, rana, Update, ALS, Daughter board prototyping
|
Tue Feb 27 21:10:45 2018, gautam, Update, ALS, Daughter board testing  
|
Wed Feb 28 19:13:25 2018, gautam, Update, ALS, ADC test for differential receiving in c1lsc
|
Fri Mar 2 01:45:06 2018, gautam, Update, ALS, new look ALS electronics
|
Mon Mar 5 17:27:34 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 00:40:25 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 19:38:37 2018, gautam, Update, ALS, digital unwhitening of daughter board
|
Thu Mar 8 23:50:27 2018, gautam, Update, ALS, First look at new ALS electronics
|
Fri Mar 9 01:07:01 2018, gautam, Update, ALS, First look at new ALS electronics
|
Mon Mar 12 22:08:31 2018, gautam, Update, ALS, Noisy POX
|
Mon Mar 12 23:57:31 2018, gautam, Update, ALS, Noisy POX 
|
Mon Mar 19 15:02:29 2018, gautam, Update, ALS, Noisy MC sensing
|
Thu Feb 1 15:31:12 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Wed Feb 7 10:16:26 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Thu Jan 25 13:18:41 2018, gautam, Update, ALS, Fiber ALS assay
|
|
Message ID: 13552
Entry time: Tue Jan 16 21:50:53 2018
In reply to: 13534
Reply to this: 13557
|
Author: |
gautam |
Type: |
Update |
Category: |
ALS |
Subject: |
Fiber ALS assay |
|
|
With Johannes' help, I re-installed the box in the LSC electronics rack. In the end, I couldn't find a good solution to thermally insulate the inside of the box with foam - the 2U box is already pretty crowded with ~100m of cabling inside of it. So I just removed all the haphazardly placed foam and closed the box up for now. We can evaluate if thermal stability of the delay line is limiting us anywhere we care about and then think about what to do in this respect. This box is actually rather heavy with ~100m of cabling inside, and is right now mounted just by using the ears on the front - probably should try and implement a more robust mounting solution for the box with some rails for it to sit on.
I then restored all the cabling - but now, the delayed part of the split RF beat signal goes to the "RF in" input of the demod board, and the non-delayed part goes to the back-panel "LO" input. I also re-did the cabling at the PSL table, to connect the two ZHL3-A amplifier inputs to the IR beat PDs in the BeatMouth instead of the green BBPDs.
I didn't measure any power levels today, my plan was to try and get a quick ALS error signal spectrum - but looks like there is too much beat signal power available at the moment, the ADC inputs for both arm beat signals are overflowing often. The flat gain on the AS165 (=ALS X) and POP55 (=ALS Y) channels have been set to 0dB, but still the input signals seem way too large. The signals on the control room spectrum analyzer come from the "RF mon" ports on the demod board, and are marked as -23dBm. I looked at these peak heights with the end green beams locked to the arm cavities, as per the proposed new ALS scheme. Not sure how much cable loss we have from the LSC rack to the network analyzer, but assuming 3dB (which is the Google value for 100ft of RG58), and reading off the peak heights from the control room analyzer, I figure that we have ~0dBm of RF signal in the X arm. => I would expect ~3dBm of signal to the LO input. Both these numbers seem well within range of what the demod board is designed to handle so I'm not sure why we are saturating.
Note that the nominal (differential) I and Q demodulated outputs from the demod board come out of a backplane connector - but we seem to be using the front panel (single-ended) "MON" channels to acquire these signals. I also need to update my Fiber ALS diagram to indicate the power loss in cabling from the PSL table to the LSC electronics rack, expect it to be a couple of dB.
Quote: |
After labeling cables I would disconnect, I pulled the box out of the LSC rack. Attachment #1 is a picture of the insides of the box - looks like it is indeed just two lengths of cabling. There was also some foam haphazardly stuck around inside - presumably an attempt at insulation/isolation.
Since I have the box out, I plan to measure the delay in each path, and also the signal attenuation. I'll also try and neaten the foam padding arrangement - Steve was showing me some foam we have, I'll use that. If anyone has comments on other changes that should be made / additional tests that should be done, please let me know.
20180111_2200: I'm running some TF measurements on the delay line box with the Agilent in the control room area (script running in tmux sesh on pianosa). Results will be uploaded later.
|
|