40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Jan 11 14:47:11 2018, Steve, Update, PSL, shelf work for tomorrow 
    Reply  Fri Jan 12 10:26:24 2018, Steve, Update, PSL, PSL shelf work schedule 
       Reply  Tue Jan 16 11:05:51 2018, gautam, Update, PSL, PSL shelf - AOM power connection interrupted 
          Reply  Tue Jan 16 16:18:47 2018, Steve, Update, PSL, new PSL shelf in place DSC00020.JPG
          Reply  Tue Jan 16 21:46:02 2018, gautam, Update, PSL, PSL shelf - AOM power connection interrupted 
Message ID: 13550     Entry time: Tue Jan 16 16:18:47 2018     In reply to: 13549
Author: Steve 
Type: Update 
Category: PSL 
Subject: new PSL shelf in place 

[ Johannes, Rana, Mark and Steve ]

On the second trial the shelf was installed. Plastic cover removed. South end door put back on and 2W Inno turned on.

Shelf 10 " below the existing one:   92" x 30" x 3/4" melamine (or MDF) covered with white Formica.  200 lbs it's max load. Working distance to top of the table 18"

Quote:

While moving the RefCav to facilitate the PSL shelf install, I bumped the power cable to the AOM driver. I will re-solder it in the evening after the shelf installation. PMC and IMC have been re-locked. Judging by the PMC refl camera image, I may also have bumped the camera as the REFL spot is now a little shifted. The fact that the IMC re-locked readily suggests that the input pointing can't have changed significantly because of the RefCav move.

 

 