Thu Jan 11 14:47:11 2018, Steve, Update, PSL, shelf work for tomorrow
|
Fri Jan 12 10:26:24 2018, Steve, Update, PSL, PSL shelf work schedule
|
Tue Jan 16 11:05:51 2018, gautam, Update, PSL, PSL shelf - AOM power connection interrupted
|
Tue Jan 16 16:18:47 2018, Steve, Update, PSL, new PSL shelf in place
|
Tue Jan 16 21:46:02 2018, gautam, Update, PSL, PSL shelf - AOM power connection interrupted
|
|
Message ID: 13550
Entry time: Tue Jan 16 16:18:47 2018
In reply to: 13549
|
Author: |
Steve |
Type: |
Update |
Category: |
PSL |
Subject: |
new PSL shelf in place |
|
|
[ Johannes, Rana, Mark and Steve ]
On the second trial the shelf was installed. Plastic cover removed. South end door put back on and 2W Inno turned on.
Shelf 10 " below the existing one: 92" x 30" x 3/4" melamine (or MDF) covered with white Formica. 200 lbs it's max load. Working distance to top of the table 18"
Quote: |
While moving the RefCav to facilitate the PSL shelf install, I bumped the power cable to the AOM driver. I will re-solder it in the evening after the shelf installation. PMC and IMC have been re-locked. Judging by the PMC refl camera image, I may also have bumped the camera as the REFL spot is now a little shifted. The fact that the IMC re-locked readily suggests that the input pointing can't have changed significantly because of the RefCav move.
|
|
|
|