40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Thu Jan 4 12:46:27 2018, gautam, Update, ALS, Fiber ALS assay 
|
Thu Jan 11 14:22:40 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 11 20:51:20 2018, gautam, Update, ALS, Fiber ALS assay
|
Tue Jan 16 21:50:53 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 18 00:35:00 2018, gautam, Update, ALS, Fiber ALS assay 
|
Fri Jan 19 11:34:21 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 19 23:04:11 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 00:33:31 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 24 10:45:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Thu Jan 25 23:59:14 2018, gautam, Update, ALS, Fiber ALS assay
|
Fri Jan 26 20:03:09 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 15:45:22 2018, gautam, Update, ALS, Fiber ALS assay
|
Wed Jan 31 16:29:42 2018, gautam, Update, ALS, Modulation depths 
|
Wed Jan 31 16:33:53 2018, gautam, Update, ALS, ALS electronics at LSC rack
|
Wed Jan 31 22:32:11 2018, gautam, Update, ALS, ALS signal chain + power budget 
|
Thu Feb 1 01:24:56 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 00:26:34 2018, gautam, Update, ALS, D0902745 revamp underway
|
Fri Feb 2 13:16:55 2018, gautam, Update, ALS, ALS signals whitening switching 
|
Mon Feb 5 14:11:01 2018, gautam, Update, ALS, Huge harmonics in ALS channels 
|
Mon Feb 5 22:57:28 2018, gautam, Update, ALS, Huge harmonics in ALS channels
|
Tue Feb 6 11:13:26 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Tue Feb 6 22:55:51 2018, gautam, Update, ALS, Possible source of ground loop identified
|
Thu Feb 8 00:33:20 2018, gautam, Update, ALS, D990694 characterization / THD measurement plan
|
Thu Feb 8 01:27:16 2018, Koji, Update, ALS, D990694 characterization / THD measurement plan
|
Fri Feb 9 13:37:44 2018, gautam, Update, ALS, THD measurement trial
|
Thu Feb 8 12:00:09 2018, gautam, Update, ALS, D990694 is NOT differential receiving
|
Thu Feb 8 13:13:14 2018, gautam, Update, ALS, D990694 pulled out  
|
Thu Feb 8 18:10:36 2018, gautam, Update, ALS, D990694 pulled out
|
Wed Feb 7 15:51:15 2018, gautam, Update, ALS, D0902745 revamp complete
|
Fri Feb 16 01:34:40 2018, gautam, Update, ALS, D0902745 in-situ testing 
|
Tue Feb 20 23:08:27 2018, gautam, Update, ALS, D0902745 in-situ testing
|
Thu Feb 22 00:09:11 2018, gautam, Update, ALS, D0902745 in-situ testing  
|
Sun Feb 25 00:03:12 2018, gautam, Update, ALS, Daughter board prototyping    
|
Mon Feb 26 20:55:56 2018, rana, Update, ALS, Daughter board prototyping
|
Tue Feb 27 21:10:45 2018, gautam, Update, ALS, Daughter board testing  
|
Wed Feb 28 19:13:25 2018, gautam, Update, ALS, ADC test for differential receiving in c1lsc
|
Fri Mar 2 01:45:06 2018, gautam, Update, ALS, new look ALS electronics
|
Mon Mar 5 17:27:34 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 00:40:25 2018, gautam, Update, ALS, new look ALS electronics - characterization
|
Thu Mar 8 19:38:37 2018, gautam, Update, ALS, digital unwhitening of daughter board
|
Thu Mar 8 23:50:27 2018, gautam, Update, ALS, First look at new ALS electronics
|
Fri Mar 9 01:07:01 2018, gautam, Update, ALS, First look at new ALS electronics
|
Mon Mar 12 22:08:31 2018, gautam, Update, ALS, Noisy POX
|
Mon Mar 12 23:57:31 2018, gautam, Update, ALS, Noisy POX 
|
Mon Mar 19 15:02:29 2018, gautam, Update, ALS, Noisy MC sensing
|
Thu Feb 1 15:31:12 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Wed Feb 7 10:16:26 2018, gautam, Update, ALS, ALS signal chain + power budget
|
Thu Jan 25 13:18:41 2018, gautam, Update, ALS, Fiber ALS assay
|
|
Message ID: 13531
Entry time: Thu Jan 11 14:22:40 2018
In reply to: 13502
Reply to this: 13534
|
Author: |
gautam |
Type: |
Update |
Category: |
ALS |
Subject: |
Fiber ALS assay |
|
|
I did a cursory check of the ALS signal chain in preparation for commissioning the IR ALS system. The main elements of this system are shown in my diagram in the previous elog in this thread.
Questions I have:
- Does anyone know what exactly is inside the "Delay Line" box? I can't find a diagram anywhere.
- Jessica's SURF report would suggest that there are just 2 50m cables in there.
- There are two power splitters taped to the top of this box.
- It is unclear to me if there are any active components in the box.
- It is unclear to me if there is any thermal/acoustic insulation in there.
- For completeness, I'd like to temporarily pull the box out of the LSC rack, open it up, take photos, and make a diagram unless there are any objections.
- If you believe the front panel labeling, then currently, the "LO" input of the mixer is being driven by the part of the ALS beat signal that goes through the delay line. The direct (i.e. non delayed) output of the power splitter goes to the "RF" input of the mixer. The mixer used, according to the DCC diagram, is a PE4140. Datasheet suggests the LO power can range from -7dBm to +20dBm. For a -8dBm beat from the IR beat PDs, with +24dB gain from the ZHL3A but -3dB from the power splitter, and assuming 9dB loss in the cable (I don't know what the actual loss is, but according to a Frank Seifert elog, the optimal loss is 8.7dB and I assume our delay line is close to optimal), this means that we have ~4dBm at the "LO" input of the demod board. The schematic says the nominal level the circuit expects is 10dBm. If we use the non-delayed output of the power splitter, we would have, for a -8dBm beat, (-8+24-3)dBm ~13dBm, plus probably some cabling loss along the way which would be closer to 10dBm. So should we use the non-delayed version for the LO signal? Is there any reason why the current wiring is done in this way?
|