Entry  Fri Dec 8 23:31:31 2017, johannes, Frogs, ASS, c1ass slow channel offloading scripts with small  
    Reply  Wed Dec 13 09:49:23 2017, johannes, Update, ASS, wiring diagram 1Y9.pdf
       Reply  Thu Dec 14 00:32:56 2017, johannes, Update, ASS, Acromag new crate; c1auxex2 configured as gateway server for acromag fp_mod_4U.pdfIMG_20171213_171541850_HDR.jpg
          Reply  Thu Dec 14 23:27:46 2017, johannes, Update, DAQ, aux chassis design auxdaq_40m_4U_front.pdfauxdaq_40m_4U_rear.pdfauxdaq_40m_4U_DSub37x2.pdfauxdaq_40m_4U_IDC50.pdf
             Reply  Tue Jan 9 00:07:03 2018, johannes, Update, DAQ, etmx slow daq chassis 
                Reply  Wed Jan 10 22:24:28 2018, johannes, Update, DAQ, etmx slow daq chassis 
                   Reply  Thu Jan 11 09:57:17 2018, Steve, Update, DAQ, acromag at ETMX Acromg_in_action.png
                   Reply  Thu Jan 11 20:59:41 2018, gautam, Update, DAQ, etmx slow daq chassis 
                      Reply  Wed Jan 17 14:32:51 2018, gautam, Update, DAQ, Acromag checks OSEMPDmon_Acro.png
                         Reply  Wed Jan 17 22:44:14 2018, johannes, Update, DAQ, Acromag checks 
                            Reply  Sun Jan 21 13:11:25 2018, johannes, Update, DAQ, Acromag checks 
                   Reply  Fri Jan 12 10:02:05 2018, johannes, Update, DAQ, etmx slow daq chassis 
                      Reply  Fri Jan 12 19:15:34 2018, johannes, Update, DAQ, etmx slow daq chassis 
                         Reply  Wed Jan 24 18:12:31 2018, johannes, Update, DAQ, ETMX auxiliary DAQ work IMG_20180124_120202019.jpgIMG_20180124_120123064.jpgIMG_20180124_120219278.jpgIMG_20180124_120059765.jpg
                            Reply  Wed Jan 24 19:17:06 2018, johannes, Update, DAQ, c1auxex2 startup behavior 
                               Reply  Wed Jan 24 23:13:30 2018, johannes, Update, DAQ, c1auxex2 startup behavior 
    Reply  Thu Dec 14 19:33:20 2017, gautam, Frogs, ASS, c1ass slow channel offloading scripts with small  
Message ID: 13517     Entry time: Tue Jan 9 00:07:03 2018     In reply to: 13478     Reply to this: 13529
Author: johannes 
Type: Update 
Category: DAQ 
Subject: etmx slow daq chassis 

All parts received and assembly near complete, small problem detected because the two DSub connectors are too close together for two cables to fit at the same time. Gautam and I will make some additional slot panels tomorrow using a waterjet cutter, so we can spread the breakout boards out and remedy this.

Fast binary channels need to be spliced into DSub connectors. Aaron is on this. All other, slow connections are already wired from before and have been tested for correct pins on the backplane DIN connectors.

 

The Acromag modules require only a positive supply voltage between +12 and +30 VDC and draw a maximum of 2.8W at that. This raises the question if we want this supply rail to be regulated or take the raw power from the Sorensens. Consulting with Ben Abbott: The Acromags in LIGO do not operate with regulated power. We could easily accomodate the standard regulator boards D1000217 in the chassis, which is probably a good idea if we want to place any custom electronics inside the chassis in the future, for example for whitening or active lowpass filtering.