40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Dec 8 23:31:31 2017, johannes, Frogs, ASS, c1ass slow channel offloading scripts with small  
    Reply  Wed Dec 13 09:49:23 2017, johannes, Update, ASS, wiring diagram 1Y9.pdf
       Reply  Thu Dec 14 00:32:56 2017, johannes, Update, ASS, Acromag new crate; c1auxex2 configured as gateway server for acromag fp_mod_4U.pdfIMG_20171213_171541850_HDR.jpg
          Reply  Thu Dec 14 23:27:46 2017, johannes, Update, DAQ, aux chassis design auxdaq_40m_4U_front.pdfauxdaq_40m_4U_rear.pdfauxdaq_40m_4U_DSub37x2.pdfauxdaq_40m_4U_IDC50.pdf
             Reply  Tue Jan 9 00:07:03 2018, johannes, Update, DAQ, etmx slow daq chassis 
                Reply  Wed Jan 10 22:24:28 2018, johannes, Update, DAQ, etmx slow daq chassis 
                   Reply  Thu Jan 11 09:57:17 2018, Steve, Update, DAQ, acromag at ETMX Acromg_in_action.png
                   Reply  Thu Jan 11 20:59:41 2018, gautam, Update, DAQ, etmx slow daq chassis 
                      Reply  Wed Jan 17 14:32:51 2018, gautam, Update, DAQ, Acromag checks OSEMPDmon_Acro.png
                         Reply  Wed Jan 17 22:44:14 2018, johannes, Update, DAQ, Acromag checks 
                            Reply  Sun Jan 21 13:11:25 2018, johannes, Update, DAQ, Acromag checks 
                   Reply  Fri Jan 12 10:02:05 2018, johannes, Update, DAQ, etmx slow daq chassis 
                      Reply  Fri Jan 12 19:15:34 2018, johannes, Update, DAQ, etmx slow daq chassis 
                         Reply  Wed Jan 24 18:12:31 2018, johannes, Update, DAQ, ETMX auxiliary DAQ work IMG_20180124_120202019.jpgIMG_20180124_120123064.jpgIMG_20180124_120219278.jpgIMG_20180124_120059765.jpg
                            Reply  Wed Jan 24 19:17:06 2018, johannes, Update, DAQ, c1auxex2 startup behavior 
                               Reply  Wed Jan 24 23:13:30 2018, johannes, Update, DAQ, c1auxex2 startup behavior 
    Reply  Thu Dec 14 19:33:20 2017, gautam, Frogs, ASS, c1ass slow channel offloading scripts with small  
Message ID: 13471     Entry time: Wed Dec 13 09:49:23 2017     In reply to: 13470     Reply to this: 13473
Author: johannes 
Type: Update 
Category: ASS 
Subject: wiring diagram 

I attached a wiring schematic from the slow DAQ to the eurocrate modules. Of these, pins 1-32 (or 1A-16C) and pins 33-64 (17A-32C) are on separate DSub connectors. Therefore the easiest solution is to splice the slow DIO channels into the existing breakouts so we can proceed with the transition. This will still remove a lot of the current cable salad. For the YEND we can start thinking about a more elegant solution (For example a connector on the front panel of the Acromag chassis for the fast DIO) now that the problem is better defined.

Attachment 1: 1Y9.pdf  18 kB  | Hide | Hide all
1Y9.pdf
ELOG V3.1.3-