40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Sep 20 16:14:17 2017, gautam, Update, Equipment loan, Impedance test kit borrowed from Downs 
    Reply  Thu Sep 21 01:32:00 2017, gautam, Update, ALS, AUX X Innolight AM measurement running Innolight_AM.pdfInnolight_AM.tar.gzIMG_7599.JPG20170921_203741_TFAG4395A_21-09-2017_115547_FourSquare.pdf
       Reply  Thu Sep 21 01:55:16 2017, rana, Update, ALS, X End table of Shame 20170921_003143.jpg20170921_002430.jpg20170921_002243.jpg20170921_001906.jpg
          Reply  Thu Sep 21 15:23:04 2017, gautam, Omnistructure, ALS, Long cable from LSC->IOO 
          Reply  Fri Sep 29 11:16:52 2017, Steve, Update, ALS, Y End table corrected ETMYf1.jpg
          Reply  Fri Oct 6 17:08:09 2017, Steve, Update, ALS, X End table beam traps corrected c1.jpgc2.jpgc3.jpgc4.jpg
       Reply  Sun Sep 24 20:47:15 2017, rana, Update, Computer Scripts / Programs, RF TF Uncertainties TFAG4395A_21-09-2017_115547_FourSquare.pdfTFAG4395A_21-09-2017_115547.tgz
          Reply  Wed Sep 27 00:20:19 2017, gautam, Update, ALS, More AM sweeps TFAG4395A_26-09-2017_202344_FourSquare.pdflowTemp.tgzTFAG4395A_26-09-2017_231630_FourSquare.pdfhighTemp.tgz
             Reply  Wed Sep 27 23:44:45 2017, gautam, Update, ALS, Proposed PM measurement setup IMG_7609.JPG
Message ID: 13327     Entry time: Thu Sep 21 15:23:04 2017     In reply to: 13326
Author: gautam 
Type: Omnistructure 
Category: ALS 
Subject: Long cable from LSC->IOO 

[steve,gautam]

We laid out a 45m long BNC cable from the LSC rack to the IOO rack via overhead cable trays. There is ~5m excess length on either side, which have been coiled up and cable-tied for now. The ends are labelled "TO LSC RACK" and "TO IOO RACK" on the appropriate ends. This is to facilitate hooking up the output of the DFD for making a PM measurement of the AUX X laser. There is already a long cable that runs from the IOO rack to the X end.

ELOG V3.1.3-