40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Sep 25 11:08:33 2015, Steve, Update, SUS, wire standoffs wireStandOff_SOS.PDF
    Reply  Mon Dec 14 14:08:49 2015, Steve, Update, SUS, Ruby wire standoffs update 
       Reply  Tue Apr 12 09:14:57 2016, Steve, Update, SUS, Ruby wire - v - groove cut pictures Sapphire_prism_wire_standoff.JPG
       Reply  Wed Jun 1 15:01:56 2016, Steve, Update, SUS, wire standoffs update 06011603.PDF06011602.PDFsapphire_stand_off_v2.pdfside_OSEM_ETMY.jpg5p2wsf.png
          Reply  Thu Jun 2 16:35:44 2016, Koji, Update, SUS, wire standoffs update sapphire_stand_off_v3.pdfarrangement-v3.pdf
             Reply  Thu Jun 1 16:21:55 2017, Steve, Update, SUS, wire standoffs update 
                Reply  Mon Jun 5 10:30:45 2017, Steve, Update, SUS, ruby wire standoff pictures A087_R.png.bmpA097_chipped_edges.png.bmpA099_cal_wire.png.bmpA101_cal_wire_43_micron.png.bmpAl_SOS_R39mm.jpg
                   Reply  Mon Jul 17 16:22:01 2017, Steve, Update, SUS, ruby wire standoff pictures contacting_ridge.bmpcontacting_ridge.png
          Reply  Tue Aug 30 15:44:28 2016, Steve, Update, SUS, wire standoffs update 
             Reply  Tue Oct 11 10:38:51 2016, Steve, Update, SUS, wire standoffs update A028_-_20161010_170319.jpgA027_-_20161010_170202.jpg
             Reply  Fri Jan 27 14:50:04 2017, Steve, Update, SUS, wire standoffs update 
                Reply  Fri Jan 27 15:36:17 2017, Koji, Update, SUS, wire standoffs update 
                   Reply  Thu Feb 23 09:32:20 2017, Koji, Update, SUS, wire standoffs update Sapphire_prism_1(A015).pngSapphire_prism_2(A016).pngSapphire_prism_3(A014).png
                Reply  Thu Feb 2 12:17:48 2017, Steve, Update, General, USB microscope 
                   Reply  Thu Feb 9 08:03:08 2017, Steve, Update, General, USB microscope ordered 
                      Reply  Thu Feb 23 14:50:26 2017, Steve, Update, General, USB microscope returned 
Message ID: 13123     Entry time: Mon Jul 17 16:22:01 2017     In reply to: 13039
Author: Steve 
Type: Update 
Category: SUS 
Subject: ruby wire standoff pictures 

Bluebean Optical Tech Limited of Shanghai delivered 50 pieces red ruby prisms with radius.  The first prism pictures were taken at June 5

and it was retaken again as BB#1 later

More samples were selected randomly as one from each bag of 5 and labeled as BB#2.......6    

 The R10 mm radius can be seen agains the  ruler edge.  The v-groove edge was labeled with blue marker and pictures were taken

from both side of this ridge. The top view is shown as the wire laying across on it.

SOS sus wire of 43 micron OD used as calibration as it was placed close to the side that it was focused on.

The V-groove ridge surface quality was evaluated based on as scale of 1 – 10 with 10 being the most positive.

 BB# Edge quality score
1 4
2 8
3 3
4 9.5
5 2
6 9

Remaining thing to examin, take picture of the contacting ridge to SOS from the side.

Attachment 1: contacting_ridge.bmp  1.747 MB  Uploaded Mon Jul 17 18:01:07 2017
Attachment 2: contacting_ridge.png  603 kB  Uploaded Mon Jul 17 18:04:40 2017  | Show | Hide all | Show all
ELOG V3.1.3-