40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Thu Jun 19 17:11:52 2014, steve, Update, PEM, it is warmer today warmertoday.png
    Reply  Mon Sep 22 10:18:58 2014, steve, Update, PEM, lab temperatures summerheat.png
       Reply  Tue Nov 4 10:40:46 2014, steve, Update, PEM, lab temperatures and particle counts PEM100d.png
          Reply  Mon Dec 8 09:03:49 2014, steve, Update, PEM, air cond maintenance tomorrow morning 
             Reply  Wed Dec 10 14:26:13 2014, steve, Update, PEM, air cond maintenance and particle plot 05.png
                Reply  Fri Sep 16 14:15:28 2016, steve, Update, PEM, partical counts 80days.png
                   Reply  Fri Dec 2 10:57:08 2016, steve, Update, PEM, door seal replaced 1_year_PEM.png
                   Reply  Fri Feb 17 10:56:12 2017, steve, Update, PEM, particle counter moved into PSL enclousure from_here.jpgto_here.jpgPSL_particles.png
                      Reply  Tue Feb 21 10:08:35 2017, steve, Update, PEM, noisy morning outside_activity.png
                      Reply  Wed Feb 22 08:54:17 2017, steve, Update, PEM, PSL enclousure particle count dusty__PSL.png
                         Reply  Tue Feb 28 08:04:48 2017, steve, Update, PEM, ETMX damping recovered ETMX.png
                            Reply  Tue Feb 28 18:25:22 2017, rana, Update, PEM, ETMX damping recovered 
                               Reply  Thu Mar 16 08:22:16 2017, Steve, Update, SUS, ETMX damping  laser_power_glitch.png
                            Reply  Mon Aug 28 10:51:21 2017, steve, Update, SUS, ETMX damping recovered ETMX_restored.png
                      Reply  Mon Mar 20 17:12:08 2017, steve, Update, PEM, particle counter inside of PSL enclousure enclousure_partical_count.png
                         Reply  Mon Mar 27 15:36:27 2017, Steve, Update, PEM, particle counter inside of PSL enclousure HEPA_flow_effects.png
Message ID: 12841     Entry time: Tue Feb 21 10:08:35 2017     In reply to: 12836
Author: steve 
Type: Update 
Category: PEM 
Subject: noisy morning 

Our new janitor Francisco is started working in IFO room today.

Quote:

The MET#1 particle counter was moved from CES wall at ITMX to PSL enclousure south west corner at 11am.

The HEPA filter speed at the Variac was turned down to 20V from 40

This counter pumps air for 1 minute in every 20 minutes. Soft foam in bags used to minimize this shaking as it is clamped.

 

Large film crews are working just out side  the north west corner of the lab. They started around ~ 5:30am  Do not plan on working late tonight.

ETMX sus damping restored.

C1:PSL-FSS_RMTEMP, C1:PSL-PMC_PMCTRANSPD and C1:PEM-count_temp channels are not reading since Friday

 