Wed Jul 27 15:03:02 2016, sisyphus, Metaphysics, SUS, Broken wire
|
Wed Jul 27 16:56:47 2016, rana, Metaphysics, SUS, Broken wire
|
Thu Jul 28 08:42:36 2016, Steve, Update, SUS, wire clamp
|
Fri Jul 29 15:17:23 2016, Steve, Update, SUS, wire and clamping test
|
Fri Jul 29 20:12:54 2016, gautam, Update, SUS, third time - no luck
|
Mon Aug 1 14:09:20 2016, Steve, Update, SUS, third time - no luck
|
Tue Aug 9 16:19:27 2016, Steve, Update, SUS, torque driver for wire clamp
|
Wed Aug 10 15:34:24 2016, Steve, Update, SUS, 6 in-lbs torque driver for wire clamp screw
|
Wed Aug 3 00:15:39 2016, gautam, Update, SUS, ETMX suspended
|
Wed Aug 3 09:26:54 2016, Lydia, Update, SUS, ETMX suspended: photos 8x
|
Thu Aug 4 03:14:39 2016, gautam, Update, SUS, ETMX suspended
|
Fri Aug 5 02:17:10 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing 8x
|
Fri Aug 5 04:43:09 2016, Koji, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing
|
Fri Aug 5 18:21:28 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff GLUED 11x
|
Sun Aug 7 14:53:39 2016, ericq , Update, SUS, ETMX Standoff gluing was successful 
|
Tue Aug 9 00:44:43 2016, gautam , Update, SUS, ETMY patch-up
|
Tue Aug 9 15:27:57 2016, gautam , Update, SUS, ETMY patch-up 
|
Wed Aug 10 03:08:03 2016, gautam , Update, SUS, ETMY patch-up
|
Wed Aug 10 23:45:03 2016, gautam , Update, SUS, ETMY re-suspended 7x
|
Thu Aug 11 00:20:41 2016, Koji, Update, SUS, ETMY re-suspended
|
Thu Aug 11 11:56:40 2016, gautam, Update, SUS, ETMY re-suspended
|
Mon Aug 15 18:28:15 2016, gautam, Update, SUS, Air-bake preparation
|
Tue Aug 16 08:04:49 2016, Steve, Update, SUS, ETMY had Aluminum bridge
|
Tue Aug 16 21:54:27 2016, gautam, Update, SUS, Air-bake - IN PROGRESS
|
Wed Aug 17 08:47:43 2016, ericq, Update, SUS, Air-bake finished
|
Wed Aug 17 23:00:57 2016, gautam, Update, SUS, Air-bake of towers
|
Thu Aug 18 08:17:16 2016, Steve, Update, SUS, wire clamping preparation
|
Thu Aug 18 14:14:20 2016, gautam, Update, SUS, Air-bake of towers - finished
|
Fri Aug 19 22:51:12 2016, gautam, Update, SUS, ETMs first-contacted
|
Sun Aug 21 16:23:05 2016, gautam, Update, SUS, ETMX suspended
|
Mon Aug 22 13:06:11 2016, gautam, Update, SUS, ETMY suspended
|
Mon Aug 22 18:04:24 2016, gautam, Update, SUS, ETMY OSEMs inserted
|
Tue Aug 23 19:35:38 2016, gautam, Update, SUS, ETMY back in IFO 10x
|
Thu Aug 25 21:11:43 2016, gautam, Update, SUS, ETMY back in IFO
|
Fri Aug 26 11:35:44 2016, gautam, Update, SUS, ETMY UL sensor problematic  
|
Fri Aug 26 14:05:38 2016, Steve, Update, SUS, ETMY UL sensor problematic
|
Fri Aug 26 14:09:46 2016, ericq, Update, SUS, ETMY UL sensor problematic
|
Sun Aug 28 21:40:11 2016, gautam, Update, SUS, ETMY UL sensor problematic
|
Mon Aug 29 09:37:05 2016, gautam, Update, SUS, ETMY UL sensor problematic
|
Mon Aug 29 14:42:06 2016, gautam, Update, SUS, ETMY Satellite box diagnostics 
|
Fri Aug 26 17:48:14 2016, gautam, Update, SUS, bounce mode coupling reduction
|
Mon Aug 29 21:53:14 2016, Lydia, Update, SUS, ETMY bounce mode coupling 
|
Tue Aug 30 20:26:36 2016, gautam, Update, SUS, ITMY installed  
|
Wed Aug 31 18:07:43 2016, Johannes, Update, SUS, ITMY free swinging
|
Wed Aug 31 22:09:18 2016, gautam, Update, SUS, Y arm locked to Green
|
Thu Sep 1 08:30:24 2016, Steve, Update, SUS, ITMY_UL is sick 
|
Tue Sep 6 20:30:56 2016, rana, Update, SUS, ITMY_UL is sick
|
Tue Sep 13 11:00:59 2016, Lydia, Update, SUS, ETMY UL glitch returned
|
Thu Sep 1 19:59:22 2016, Johannes, Update, SUS, IR mode flashes in Y arm
|
Fri Sep 2 21:09:08 2016, gautam, Update, SUS, Y arm locked in air 
|
Tue Sep 6 20:45:14 2016, gautam, Update, SUS, X arm test masses back in chamber   
|
Thu Sep 8 22:12:36 2016, gautam, Update, SUS, X arm in place, locked to green, IR flashes visible
|
Fri Sep 9 17:50:02 2016, gautam, Update, SUS, Heavy doors on BS-PRM, ETMY chambers
|
Sat Sep 10 14:26:01 2016, rana, Update, General, PRM SRM alignment
|
Mon Sep 12 17:15:22 2016, Johannes, Update, General, PRM SRM alignment 
|
Thu Sep 1 19:18:14 2016, Johannes, Update, SUS, ITMX and ETMX preemptive table leveling 8x
|
Fri Sep 2 21:15:53 2016, gautam, Update, SUS, ITMX and ETMX preemptive table leveling
|
Thu Sep 1 15:43:16 2016, rana, Update, SUS, OSEM adjustments
|
Mon Sep 5 19:57:24 2016, Osamu, Update, SUS, OSEM adjustments
|
|
Message ID: 12455
Entry time: Tue Aug 30 20:26:36 2016
In reply to: 12452
Reply to this: 12456
12462
|
Author: |
gautam |
Type: |
Update |
Category: |
SUS |
Subject: |
ITMY installed |
|
|
[gautam, johannes, lydia]
Today we installed ITMY into position in the chamber.
- First, we took the F.C coat off both faces
- A stream of ionized nitrogen was used during the peeling process. We took as much care as possible not to blow towards the SRM.
- F.C. films came off smoothly. But when we looked at a picture we took prior to putting the optic in place, it looks like there may be a sliver of F.C. left on the optic. There are also a few specks of dust visible on the HR face, but well away from the clear aperture (see Attachment #1). Do we want to use isopropanol + optical tissue to try and remove these?
- After F.C removal, we moved the optic into place against its stops. Returned OSEM connector tower to approximately its original place as it was moved to facilitate shifting the ITM to the edge of the table.
- I cleaned up the tangled mess of OSEM connector wires. On the ITMY tower, the OSEM cables have been tied using pieces of thin copper wire so as to avoid the wires straying into the beam path. Checked that wires are in grooves on both sides.
- Unfortunately we were not able to start on setting up a cavity today, because when we checked the leveling of the ITM, we found that it was significantly not level. This is probably because the ITM was at the edge of the table. The cage is rather heavy and the location it was put in had a large lever arm. In any case, the table is slowly relaxing back to their usual state, Steve recommended we leave it overnight.
- Other issues:
- the UL sensor on ITMY also seemed to show some evidence of glitchy behaviour. Looking in the Satellite box, I didn't see any obvious probelms like I did for the ETMY box (for which I am not even sure if I did a legitimate fix anyways). I guess we have to keep observing and think about doing something about this if it really is problematic.
- SRM barrel is pretty dusty. So is SR3. Do we want to clean these? If so how? F.C. or isoprop drag wipe?
We did some quick checks with the green beam and the IR beam. With the help of the custom Iris for the suspension towers, we gauged that both beams are pretty close to the center of the test mass. So we are in a not unreasonable place to start trying to align the beam. Of course we didn't check if the beam makes it to the ETM today.
The SRM OSEM sensor problem seems to have been resolved by moving the ITM back to its place as we suspected. The values are converging, but not to their pre-vent values (attachment #2). We can adjust these if necessary I guess... Or perhaps this fixes itself once the table returns to its neutral position. This remains to be monitored.
In the never-ending B-R mode reduction saga - we found what we think is an acceptable configuration now. Spectrum attached (Attachment #3). The top two OSEMs are now nearly 90 degrees rotated, while the bottom two are nearly horizontal. Anyways I guess we just have to trust the spectra. I should also point out that the spectra change rather significantly from measurement to measurement. But I think this is good enough to push ahead, unless anyone thinks otherwise? |
|
|
|
|
|
|