40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Jul 27 15:03:02 2016, sisyphus, Metaphysics, SUS, Broken wire Unknown.jpeg
    Reply  Wed Jul 27 16:56:47 2016, rana, Metaphysics, SUS, Broken wire 
    Reply  Thu Jul 28 08:42:36 2016, Steve, Update, SUS, wire clamp e12342.jpg
    Reply  Fri Jul 29 15:17:23 2016, Steve, Update, SUS, wire and clamping test 43micr242grs.jpg
       Reply  Fri Jul 29 20:12:54 2016, gautam, Update, SUS, third time - no luck 
          Reply  Mon Aug 1 14:09:20 2016, Steve, Update, SUS, third time - no luck 
             Reply  Tue Aug 9 16:19:27 2016, Steve, Update, SUS, torque driver for wire clamp 
                Reply  Wed Aug 10 15:34:24 2016, Steve, Update, SUS, 6 in-lbs torque driver for wire clamp screw 
          Reply  Wed Aug 3 00:15:39 2016, gautam, Update, SUS, ETMX suspended 
             Reply  Wed Aug 3 09:26:54 2016, Lydia, Update, SUS, ETMX suspended: photos 8x
             Reply  Thu Aug 4 03:14:39 2016, gautam, Update, SUS, ETMX suspended 
                Reply  Fri Aug 5 02:17:10 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing 8x
                   Reply  Fri Aug 5 04:43:09 2016, Koji, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing 
                   Reply  Fri Aug 5 18:21:28 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff GLUED 11x
                      Reply  Sun Aug 7 14:53:39 2016, ericq , Update, SUS, ETMX Standoff gluing was successful ETMX_resonances.pdfETMX_SUSspectra.zip
                         Reply  Tue Aug 9 00:44:43 2016, gautam , Update, SUS, ETMY patch-up 
                            Reply  Tue Aug 9 15:27:57 2016, gautam , Update, SUS, ETMY patch-up IMG_2996.JPGIMG_2997.JPG
                               Reply  Wed Aug 10 03:08:03 2016, gautam , Update, SUS, ETMY patch-up 
                                  Reply  Wed Aug 10 23:45:03 2016, gautam , Update, SUS, ETMY re-suspended 7x
                                     Reply  Thu Aug 11 00:20:41 2016, Koji, Update, SUS, ETMY re-suspended 
                                        Reply  Thu Aug 11 11:56:40 2016, gautam, Update, SUS, ETMY re-suspended pitchBalancingWithBias.PDF
                                           Reply  Mon Aug 15 18:28:15 2016, gautam, Update, SUS, Air-bake preparation IMG_6816.JPG
                                              Reply  Tue Aug 16 08:04:49 2016, Steve, Update, SUS, ETMY had Aluminum bridge AlBridge.jpg
                                              Reply  Tue Aug 16 21:54:27 2016, gautam, Update, SUS, Air-bake - IN PROGRESS IMG_3005.JPG
                                                 Reply  Wed Aug 17 08:47:43 2016, ericq, Update, SUS, Air-bake finished 
                                                    Reply  Wed Aug 17 23:00:57 2016, gautam, Update, SUS, Air-bake of towers IMG_3006.JPG
                                                       Reply  Thu Aug 18 08:17:16 2016, Steve, Update, SUS, wire clamping preparation 800P.jpg
                                                       Reply  Thu Aug 18 14:14:20 2016, gautam, Update, SUS, Air-bake of towers - finished 
                                                          Reply  Fri Aug 19 22:51:12 2016, gautam, Update, SUS, ETMs first-contacted 
                                                             Reply  Sun Aug 21 16:23:05 2016, gautam, Update, SUS, ETMX suspended IMG_3018.JPG
                                                                Reply  Mon Aug 22 13:06:11 2016, gautam, Update, SUS, ETMY suspended IMG_3019.JPG
                                                                   Reply  Mon Aug 22 18:04:24 2016, gautam, Update, SUS, ETMY OSEMs inserted 
                                                                      Reply  Tue Aug 23 19:35:38 2016, gautam, Update, SUS, ETMY back in IFO 10x
                                                                         Reply  Thu Aug 25 21:11:43 2016, gautam, Update, SUS, ETMY back in IFO ETMY_BounceSpectra_25Aug2016.pdf
                                                                            Reply  Fri Aug 26 11:35:44 2016, gautam, Update, SUS, ETMY UL sensor problematic  ETMY_BounceSpectra_26Aug2016.pdf41.png19.png
                                                                               Reply  Fri Aug 26 14:05:38 2016, Steve, Update, SUS, ETMY UL sensor problematic  ETMY-ULhistory.png
                                                                               Reply  Fri Aug 26 14:09:46 2016, ericq, Update, SUS, ETMY UL sensor problematic  
                                                                                  Reply  Sun Aug 28 21:40:11 2016, gautam, Update, SUS, ETMY UL sensor problematic  ETMY_UL_problematic.png
                                                                                     Reply  Mon Aug 29 09:37:05 2016, gautam, Update, SUS, ETMY UL sensor problematic  satelliteBox.png
                                                                                        Reply  Mon Aug 29 14:42:06 2016, gautam, Update, SUS, ETMY Satellite box diagnostics IMG_6840.JPGIMG_6841.JPG
                                                                            Reply  Fri Aug 26 17:48:14 2016, gautam, Update, SUS, bounce mode coupling reduction ETMY_BounceSpectra_26Aug2016_1.pdf
                                                                               Reply  Mon Aug 29 21:53:14 2016, Lydia, Update, SUS, ETMY bounce mode coupling IMG_3051.JPG42.png
                                                                                  Reply  Tue Aug 30 20:26:36 2016, gautam, Update, SUS, ITMY installed IMG_3052.JPGSRM_sensor_level_comp.pngETMY_BounceSpectra_30Aug2016.pdf
                                                                                     Reply  Wed Aug 31 18:07:43 2016, Johannes, Update, SUS, ITMY free swinging 
                                                                                        Reply  Wed Aug 31 22:09:18 2016, gautam, Update, SUS, Y arm locked to Green  
                                                                                           Reply  Thu Sep 1 08:30:24 2016, Steve, Update, SUS, ITMY_UL is sick ITMY_SENSOR_UL.pngspareSatAmp.jpg
                                                                                              Reply  Tue Sep 6 20:30:56 2016, rana, Update, SUS, ITMY_UL is sick 
                                                                                                 Reply  Tue Sep 13 11:00:59 2016, Lydia, Update, SUS, ETMY UL glitch returned 
                                                                                           Reply  Thu Sep 1 19:59:22 2016, Johannes, Update, SUS, IR mode flashes in Y arm 
                                                                                              Reply  Fri Sep 2 21:09:08 2016, gautam, Update, SUS, Y arm locked in air 03.png56.png
                                                                                                 Reply  Tue Sep 6 20:45:14 2016, gautam, Update, SUS, X arm test masses back in chamber IMG_3137.JPGIMG_3143.JPGIMG_3142.JPGIMG_3148.JPG
                                                                                                    Reply  Thu Sep 8 22:12:36 2016, gautam, Update, SUS, X arm in place, locked to green, IR flashes visible 
                                                                                                       Reply  Fri Sep 9 17:50:02 2016, gautam, Update, SUS, Heavy doors on BS-PRM, ETMY chambers 
                                                                                                          Reply  Sat Sep 10 14:26:01 2016, rana, Update, General, PRM SRM alignment Osamu.JPG
                                                                                                             Reply  Mon Sep 12 17:15:22 2016, Johannes, Update, General, PRM SRM alignment IMG_3273.JPGIMG_3275.JPG
                                                                                        Reply  Thu Sep 1 19:18:14 2016, Johannes, Update, SUS, ITMX and ETMX preemptive table leveling 8x
                                                                                           Reply  Fri Sep 2 21:15:53 2016, gautam, Update, SUS, ITMX and ETMX preemptive table leveling 
                                                                                     Reply  Thu Sep 1 15:43:16 2016, rana, Update, SUS, OSEM adjustments 
                                                                                        Reply  Mon Sep 5 19:57:24 2016, Osamu, Update, SUS, OSEM adjustments 
Message ID: 12424     Entry time: Fri Aug 19 22:51:12 2016     In reply to: 12422     Reply to this: 12426
Author: gautam 
Type: Update 
Category: SUS 
Subject: ETMs first-contacted 

I've applied first contact to both the ETMs. They're now ready to be suspended. I've also cut up some lengths of the new wire and put them in the oven for a 12 hour 70C bake. 

  • For both ETMs, I first applied first contact to the bulk of the HR and AR surfaces (all the way out to the edge for the HR, for the AR as large an area as possible without getting too close to the magnets). Calum recommended pouring first contact onto the horizontal optic, but since I had no practise with this method, I opted not to try it out for the first time on our ETMs
  • After allowing this to dry for 24 hours, I peeled this layer off. Visual inspection suggests that the whole film came off cleanly. 
  • I then applied first contact to a smaller area around the center of the optic for only the HR surface. This will only be peeled off once the suspended optic is back in the vacuum chamber. This way, we keep the HR face protected for as long as possible.
  • Even though we applied F.C to both faces of the ITMs, I don't think its so important to keep a film on the AR side of the ETMs till we take it in. So I didnt re-coat the AR side with a smaller area of F.C. This way, if we want, we can do the OSEM assembly in the cleanroom without having to worry about peeling the F.C off with limited access to the rear of the optic.
  • I also opted to bake some lengths of the newly arrived steel wire for suspension. Not sure how important/useful this bake will be.

Unless we want the AR surface to also have a small F.C coat until the optic is in the vacuum chamber, I think I will proceed with re-suspending the ETMs..

ELOG V3.1.3-