40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Jul 27 15:03:02 2016, sisyphus, Metaphysics, SUS, Broken wire Unknown.jpeg
    Reply  Wed Jul 27 16:56:47 2016, rana, Metaphysics, SUS, Broken wire 
    Reply  Thu Jul 28 08:42:36 2016, Steve, Update, SUS, wire clamp e12342.jpg
    Reply  Fri Jul 29 15:17:23 2016, Steve, Update, SUS, wire and clamping test 43micr242grs.jpg
       Reply  Fri Jul 29 20:12:54 2016, gautam, Update, SUS, third time - no luck 
          Reply  Mon Aug 1 14:09:20 2016, Steve, Update, SUS, third time - no luck 
             Reply  Tue Aug 9 16:19:27 2016, Steve, Update, SUS, torque driver for wire clamp 
                Reply  Wed Aug 10 15:34:24 2016, Steve, Update, SUS, 6 in-lbs torque driver for wire clamp screw 
          Reply  Wed Aug 3 00:15:39 2016, gautam, Update, SUS, ETMX suspended 
             Reply  Wed Aug 3 09:26:54 2016, Lydia, Update, SUS, ETMX suspended: photos 8x
             Reply  Thu Aug 4 03:14:39 2016, gautam, Update, SUS, ETMX suspended 
                Reply  Fri Aug 5 02:17:10 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing 8x
                   Reply  Fri Aug 5 04:43:09 2016, Koji, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing 
                   Reply  Fri Aug 5 18:21:28 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff GLUED 11x
                      Reply  Sun Aug 7 14:53:39 2016, ericq , Update, SUS, ETMX Standoff gluing was successful ETMX_resonances.pdfETMX_SUSspectra.zip
                         Reply  Tue Aug 9 00:44:43 2016, gautam , Update, SUS, ETMY patch-up 
                            Reply  Tue Aug 9 15:27:57 2016, gautam , Update, SUS, ETMY patch-up IMG_2996.JPGIMG_2997.JPG
                               Reply  Wed Aug 10 03:08:03 2016, gautam , Update, SUS, ETMY patch-up 
                                  Reply  Wed Aug 10 23:45:03 2016, gautam , Update, SUS, ETMY re-suspended 7x
                                     Reply  Thu Aug 11 00:20:41 2016, Koji, Update, SUS, ETMY re-suspended 
                                        Reply  Thu Aug 11 11:56:40 2016, gautam, Update, SUS, ETMY re-suspended pitchBalancingWithBias.PDF
                                           Reply  Mon Aug 15 18:28:15 2016, gautam, Update, SUS, Air-bake preparation IMG_6816.JPG
                                              Reply  Tue Aug 16 08:04:49 2016, Steve, Update, SUS, ETMY had Aluminum bridge AlBridge.jpg
                                              Reply  Tue Aug 16 21:54:27 2016, gautam, Update, SUS, Air-bake - IN PROGRESS IMG_3005.JPG
                                                 Reply  Wed Aug 17 08:47:43 2016, ericq, Update, SUS, Air-bake finished 
                                                    Reply  Wed Aug 17 23:00:57 2016, gautam, Update, SUS, Air-bake of towers IMG_3006.JPG
                                                       Reply  Thu Aug 18 08:17:16 2016, Steve, Update, SUS, wire clamping preparation 800P.jpg
                                                       Reply  Thu Aug 18 14:14:20 2016, gautam, Update, SUS, Air-bake of towers - finished 
                                                          Reply  Fri Aug 19 22:51:12 2016, gautam, Update, SUS, ETMs first-contacted 
                                                             Reply  Sun Aug 21 16:23:05 2016, gautam, Update, SUS, ETMX suspended IMG_3018.JPG
                                                                Reply  Mon Aug 22 13:06:11 2016, gautam, Update, SUS, ETMY suspended IMG_3019.JPG
                                                                   Reply  Mon Aug 22 18:04:24 2016, gautam, Update, SUS, ETMY OSEMs inserted 
                                                                      Reply  Tue Aug 23 19:35:38 2016, gautam, Update, SUS, ETMY back in IFO 10x
                                                                         Reply  Thu Aug 25 21:11:43 2016, gautam, Update, SUS, ETMY back in IFO ETMY_BounceSpectra_25Aug2016.pdf
                                                                            Reply  Fri Aug 26 11:35:44 2016, gautam, Update, SUS, ETMY UL sensor problematic  ETMY_BounceSpectra_26Aug2016.pdf41.png19.png
                                                                               Reply  Fri Aug 26 14:05:38 2016, Steve, Update, SUS, ETMY UL sensor problematic  ETMY-ULhistory.png
                                                                               Reply  Fri Aug 26 14:09:46 2016, ericq, Update, SUS, ETMY UL sensor problematic  
                                                                                  Reply  Sun Aug 28 21:40:11 2016, gautam, Update, SUS, ETMY UL sensor problematic  ETMY_UL_problematic.png
                                                                                     Reply  Mon Aug 29 09:37:05 2016, gautam, Update, SUS, ETMY UL sensor problematic  satelliteBox.png
                                                                                        Reply  Mon Aug 29 14:42:06 2016, gautam, Update, SUS, ETMY Satellite box diagnostics IMG_6840.JPGIMG_6841.JPG
                                                                            Reply  Fri Aug 26 17:48:14 2016, gautam, Update, SUS, bounce mode coupling reduction ETMY_BounceSpectra_26Aug2016_1.pdf
                                                                               Reply  Mon Aug 29 21:53:14 2016, Lydia, Update, SUS, ETMY bounce mode coupling IMG_3051.JPG42.png
                                                                                  Reply  Tue Aug 30 20:26:36 2016, gautam, Update, SUS, ITMY installed IMG_3052.JPGSRM_sensor_level_comp.pngETMY_BounceSpectra_30Aug2016.pdf
                                                                                     Reply  Wed Aug 31 18:07:43 2016, Johannes, Update, SUS, ITMY free swinging 
                                                                                        Reply  Wed Aug 31 22:09:18 2016, gautam, Update, SUS, Y arm locked to Green  
                                                                                           Reply  Thu Sep 1 08:30:24 2016, Steve, Update, SUS, ITMY_UL is sick ITMY_SENSOR_UL.pngspareSatAmp.jpg
                                                                                              Reply  Tue Sep 6 20:30:56 2016, rana, Update, SUS, ITMY_UL is sick 
                                                                                                 Reply  Tue Sep 13 11:00:59 2016, Lydia, Update, SUS, ETMY UL glitch returned 
                                                                                           Reply  Thu Sep 1 19:59:22 2016, Johannes, Update, SUS, IR mode flashes in Y arm 
                                                                                              Reply  Fri Sep 2 21:09:08 2016, gautam, Update, SUS, Y arm locked in air 03.png56.png
                                                                                                 Reply  Tue Sep 6 20:45:14 2016, gautam, Update, SUS, X arm test masses back in chamber IMG_3137.JPGIMG_3143.JPGIMG_3142.JPGIMG_3148.JPG
                                                                                                    Reply  Thu Sep 8 22:12:36 2016, gautam, Update, SUS, X arm in place, locked to green, IR flashes visible 
                                                                                                       Reply  Fri Sep 9 17:50:02 2016, gautam, Update, SUS, Heavy doors on BS-PRM, ETMY chambers 
                                                                                                          Reply  Sat Sep 10 14:26:01 2016, rana, Update, General, PRM SRM alignment Osamu.JPG
                                                                                                             Reply  Mon Sep 12 17:15:22 2016, Johannes, Update, General, PRM SRM alignment IMG_3273.JPGIMG_3275.JPG
                                                                                        Reply  Thu Sep 1 19:18:14 2016, Johannes, Update, SUS, ITMX and ETMX preemptive table leveling 8x
                                                                                           Reply  Fri Sep 2 21:15:53 2016, gautam, Update, SUS, ITMX and ETMX preemptive table leveling 
                                                                                     Reply  Thu Sep 1 15:43:16 2016, rana, Update, SUS, OSEM adjustments 
                                                                                        Reply  Mon Sep 5 19:57:24 2016, Osamu, Update, SUS, OSEM adjustments 
Message ID: 12381     Entry time: Fri Aug 5 18:21:28 2016     In reply to: 12377     Reply to this: 12382
Author: gautam 
Type: Update 
Category: SUS 
Subject: ETMX Ruby Wire Standoff GLUED 
  • The latest twist in this apparently never-ending saga was that even though fine pitch balancing was achieved, the wire was out of the groove on both sides!
  • I rectified this situation in the morning, did the fine pitch balancing in the afternoon
  • Koji's suggestion of adjusting the OSEM holding plate totally did the trick, all four magnets are reasonably well centered relative to the vertical now...
  • After the latest round of fine pitch balancing, we are now tilted in pitch backwards (i.e. towards the AR face) by <0.7mrad. 
  • Prior to gluing, I visually inspected the optic to check that (see attachments):
    • Wires are in grooves on both sides
    • Unglued ruby standoff has the correct "rotation", i.e. that the wire contacts the standoff after the groove has started, and leaves it before the groove ends, since the groove doesn't go all the way around the standoff
    • Section of wire around the bottom half of the optic has no obvious kinks/other funny features
    • Unglued standoff is in contact with the barrel
    • All magnets are well clear of teflon in OSEM coils on both sides
  • Eric also checked the frequencies of the various modes (PIT, YAW, POS and SIDE) by looking at the power spectrum of the free-swinging error signals on the coils. The pitch mode is now softer than before, at ~710mHz
  • We then proceeded to glue the optic, using a needle to apply the glue (optic was clamped using face EQ stops, bottom EQ stops were not engaged as we felt this would affect the fine pitch balancing
  • During the process, it looks like we may have inadvertently gotten some glue onto the wire (see attachments) - it doesn't look like any has seeped into the groove itself, but there is definitely some on the wire. We can possibly try cleaning this once the optic is out. In the worst case scenario, we will have to loop another section of wire, but the fine pitch balancing should be unaffected provided we did not perturb the optic too much
  • Bob has said the large oven will be available to bake the cages on Tuesday, August 9th. By this time, we should have ETMY suspended as well (we were unable to glue the knocked off magnet on ETMY as the glass bowl we had for soaking the edge of the optic in acetone to remove the epoxy residue broke while I was assembling the various pieces of Teflon inside it. Steve is procuring a new one on Monday). It is still unclear when we can vacuum bake the two ETMs...

Attachments:

Attachment #1: Wire is in the groove in the unglued wire-standoff, groove rotation looks pretty good.

Attachment #2: Ruby standoff is sitting on the barrel of the optic (if you zoom in)

Attachment #3: Side magnet is well centered w.r.t OSEM coil

Attachment #4: UR magnet is well centered w.r.t OSEM coil

Attachment #5: UL magnet is well centered w.r.t OSEM coil

Attachment #6: LL magnet is well centered w.r.t OSEM coil

Attachment #7: LR magnet is well centered w.r.t OSEM coil

Attachment #8: Wire is in the groove in the glued Ruby standoff

Attachment #9: Standoff after gluing. 3-4 drops of epoxy are visible on the wire, but none looks to have seeped into the groove itself

Attachment #10: Side view of newly glued Ruby standoff

Attachment #11: Before and After gluing shots.

 

 
 
 

 

Attachment 1: IMG_2966.JPG  6.649 MB  | Show | Hide all | Show all
Attachment 2: IMG_2969.JPG  5.892 MB  | Hide | Hide all | Show all
IMG_2969.JPG
Attachment 3: IMG_2970.JPG  5.971 MB  | Hide | Hide all | Show all
IMG_2970.JPG
Attachment 4: IMG_2972.JPG  5.246 MB  | Hide | Hide all | Show all
IMG_2972.JPG
Attachment 5: IMG_2972.JPG  5.246 MB  | Hide | Hide all | Show all
IMG_2972.JPG
Attachment 6: IMG_2973.JPG  4.863 MB  | Hide | Hide all | Show all
IMG_2973.JPG
Attachment 7: IMG_2974.JPG  4.918 MB  | Show | Hide all | Show all
Attachment 8: IMG_2967.JPG  5.699 MB  | Hide | Hide all | Show all
IMG_2967.JPG
Attachment 9: IMG_2980.JPG  6.056 MB  | Hide | Hide all | Show all
IMG_2980.JPG
Attachment 10: IMG_2985.JPG  5.275 MB  | Hide | Hide all | Show all
IMG_2985.JPG
Attachment 11: BeforeNAfter.PDF  139 kB  | Show | Hide all | Show all
ELOG V3.1.3-