Wed Jul 27 15:03:02 2016, sisyphus, Metaphysics, SUS, Broken wire
|
Wed Jul 27 16:56:47 2016, rana, Metaphysics, SUS, Broken wire
|
Thu Jul 28 08:42:36 2016, Steve, Update, SUS, wire clamp
|
Fri Jul 29 15:17:23 2016, Steve, Update, SUS, wire and clamping test
|
Fri Jul 29 20:12:54 2016, gautam, Update, SUS, third time - no luck
|
Mon Aug 1 14:09:20 2016, Steve, Update, SUS, third time - no luck
|
Tue Aug 9 16:19:27 2016, Steve, Update, SUS, torque driver for wire clamp
|
Wed Aug 10 15:34:24 2016, Steve, Update, SUS, 6 in-lbs torque driver for wire clamp screw
|
Wed Aug 3 00:15:39 2016, gautam, Update, SUS, ETMX suspended
|
Wed Aug 3 09:26:54 2016, Lydia, Update, SUS, ETMX suspended: photos 8x
|
Thu Aug 4 03:14:39 2016, gautam, Update, SUS, ETMX suspended
|
Fri Aug 5 02:17:10 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing 8x
|
Fri Aug 5 04:43:09 2016, Koji, Update, SUS, ETMX Ruby Wire Standoff Ready for Gluing
|
Fri Aug 5 18:21:28 2016, gautam, Update, SUS, ETMX Ruby Wire Standoff GLUED 11x
|
Sun Aug 7 14:53:39 2016, ericq , Update, SUS, ETMX Standoff gluing was successful 
|
Tue Aug 9 00:44:43 2016, gautam , Update, SUS, ETMY patch-up
|
Tue Aug 9 15:27:57 2016, gautam , Update, SUS, ETMY patch-up 
|
Wed Aug 10 03:08:03 2016, gautam , Update, SUS, ETMY patch-up
|
Wed Aug 10 23:45:03 2016, gautam , Update, SUS, ETMY re-suspended 7x
|
Thu Aug 11 00:20:41 2016, Koji, Update, SUS, ETMY re-suspended
|
Thu Aug 11 11:56:40 2016, gautam, Update, SUS, ETMY re-suspended
|
Mon Aug 15 18:28:15 2016, gautam, Update, SUS, Air-bake preparation
|
Tue Aug 16 08:04:49 2016, Steve, Update, SUS, ETMY had Aluminum bridge
|
Tue Aug 16 21:54:27 2016, gautam, Update, SUS, Air-bake - IN PROGRESS
|
Wed Aug 17 08:47:43 2016, ericq, Update, SUS, Air-bake finished
|
Wed Aug 17 23:00:57 2016, gautam, Update, SUS, Air-bake of towers
|
Thu Aug 18 08:17:16 2016, Steve, Update, SUS, wire clamping preparation
|
Thu Aug 18 14:14:20 2016, gautam, Update, SUS, Air-bake of towers - finished
|
Fri Aug 19 22:51:12 2016, gautam, Update, SUS, ETMs first-contacted
|
Sun Aug 21 16:23:05 2016, gautam, Update, SUS, ETMX suspended
|
Mon Aug 22 13:06:11 2016, gautam, Update, SUS, ETMY suspended
|
Mon Aug 22 18:04:24 2016, gautam, Update, SUS, ETMY OSEMs inserted
|
Tue Aug 23 19:35:38 2016, gautam, Update, SUS, ETMY back in IFO 10x
|
Thu Aug 25 21:11:43 2016, gautam, Update, SUS, ETMY back in IFO
|
Fri Aug 26 11:35:44 2016, gautam, Update, SUS, ETMY UL sensor problematic  
|
Fri Aug 26 14:05:38 2016, Steve, Update, SUS, ETMY UL sensor problematic
|
Fri Aug 26 14:09:46 2016, ericq, Update, SUS, ETMY UL sensor problematic
|
Sun Aug 28 21:40:11 2016, gautam, Update, SUS, ETMY UL sensor problematic
|
Mon Aug 29 09:37:05 2016, gautam, Update, SUS, ETMY UL sensor problematic
|
Mon Aug 29 14:42:06 2016, gautam, Update, SUS, ETMY Satellite box diagnostics 
|
Fri Aug 26 17:48:14 2016, gautam, Update, SUS, bounce mode coupling reduction
|
Mon Aug 29 21:53:14 2016, Lydia, Update, SUS, ETMY bounce mode coupling 
|
Tue Aug 30 20:26:36 2016, gautam, Update, SUS, ITMY installed  
|
Wed Aug 31 18:07:43 2016, Johannes, Update, SUS, ITMY free swinging
|
Wed Aug 31 22:09:18 2016, gautam, Update, SUS, Y arm locked to Green
|
Thu Sep 1 08:30:24 2016, Steve, Update, SUS, ITMY_UL is sick 
|
Tue Sep 6 20:30:56 2016, rana, Update, SUS, ITMY_UL is sick
|
Tue Sep 13 11:00:59 2016, Lydia, Update, SUS, ETMY UL glitch returned
|
Thu Sep 1 19:59:22 2016, Johannes, Update, SUS, IR mode flashes in Y arm
|
Fri Sep 2 21:09:08 2016, gautam, Update, SUS, Y arm locked in air 
|
Tue Sep 6 20:45:14 2016, gautam, Update, SUS, X arm test masses back in chamber   
|
Thu Sep 8 22:12:36 2016, gautam, Update, SUS, X arm in place, locked to green, IR flashes visible
|
Fri Sep 9 17:50:02 2016, gautam, Update, SUS, Heavy doors on BS-PRM, ETMY chambers
|
Sat Sep 10 14:26:01 2016, rana, Update, General, PRM SRM alignment
|
Mon Sep 12 17:15:22 2016, Johannes, Update, General, PRM SRM alignment 
|
Thu Sep 1 19:18:14 2016, Johannes, Update, SUS, ITMX and ETMX preemptive table leveling 8x
|
Fri Sep 2 21:15:53 2016, gautam, Update, SUS, ITMX and ETMX preemptive table leveling
|
Thu Sep 1 15:43:16 2016, rana, Update, SUS, OSEM adjustments
|
Mon Sep 5 19:57:24 2016, Osamu, Update, SUS, OSEM adjustments
|
|
Message ID: 12377
Entry time: Fri Aug 5 02:17:10 2016
In reply to: 12370
Reply to this: 12378
12381
|
Author: |
gautam |
Type: |
Update |
Category: |
SUS |
Subject: |
ETMX Ruby Wire Standoff Ready for Gluing |
|
|
Part 1: Rotation of optic
- As reported in my elog yesterday, both the left magnets (UL and LL) seemed too low relative to the OSEM coils
- Eric and I checked the height of the scribe lines using the microscope and found that the scribe lines were low on the left side and high on the right side (as viewed from the AR side) by approximately the same amount, confirming our suspicion that the optic was rotated. The position of the scribe line on the bottom of the optic relative to the bottom-rear face EQ stop also suggested the same
- Eric brought in the bottom EQ stops, and once the wire was slightly unloaded, rotated the optic by the required amount by hand
- This process took two tries, but we were successful
- Re-checked heights of scribe lines using microscope, and once we were satisfied, re-did the coarse pitch balancing
Part 2: Replacement of holder for top pair of OSEMs
- Eric and I had difficulty removing the UR OSEM-holding screw
- This is the non-silver-coated new variety of screw
- It got to a point where I could neither move the screw in or out, even with the help of a pair of pliers
- I decided to swap out the piece of the suspension tower holding the top two OSEMs (UR and UL) with the same piece from the old ETMX tower that is currently residing on the flow bench at the south end (along with the accompanying piece that overhangs the optic and holds the front-face and top earthquake stops
- I cleaned the piece 3-4 times with acetone, and then a couple of times with isopropanol. I adjudged this to be sufficient as we are going to air bake the tower anyways prior to installation in the vacuum chamber
- I then swapped the pieces:
- First I brought in the bottom pairs of EQ stops
- Next, I secured the optic using the three lower face EQ stops
- Then, I removed the EQ stop screws from the overhanging piece, after which I removed the overhanging piece itself
- After removing the top-back EQ stop, I removed the OSEM-holding piece from the suspension tower
- Did the above steps in reverse, installing the new piece
- All went smoothly. This piece does not have a serial number unfortunately
- After this, I re-inserted the OSEMs, and judged the magnet-coil alignment to be satisfactory to proceed further
- We decided to use the old variety of silver plated OSEM holding screws for the top two OSEMs (by choice) and the side OSEM (the new variety is too short anyways). During the course of my work tonight, I found this worked way better. The bottom pair of OSEMs remain held by the new variety of unplated screws. We may want to review whether we really want to use this new type of screws (I believe the idea is to make it easier to tighten and loosen the screws)
Part 3: Fine pitch balancing
- As per the SOS assembly procedure, I turned off the HEPA filters at the clean bench for this part of the work
- Checked that the HeNe beam incident on the optic was level with the tabletop, beam height set to 5.5"
- Proceeded to do the fine pitch balancing the same way as described in yesterday's elog (i.e. no PZT buzzer, just fine touches by hand)
- I was able to converge fairly quickly to a good point in configuration space
- After re-centering the OSEM coils such that the PD output was ~50% of its maximum value (see Attachment #1), I found over a lever arm length of 56" (=1.42m) a beam height deviation from 5.5" by <2mm. This corresponds to 0.7mrad pitching forwards towards the HR side
- The suspension assembly procedure tells us to aim for 0.5mrad, but I think this is close enough for standoff gluing, as this misalignment is extremely sensitive to the OSEM coil positions (although I would say, from Attachment #1, that they are actually pretty well centered)
- The only thing that concerns me is that the LL magnet is still a little low relative to the coil. This can be fixed by shimming if necessary...
Attachment #1: Striptool trace showing OSEMs are pretty well centered (towards the end, I turned on the HEPA filters again, which explains the shift of the traces). The y-axis is normalized such that the maximum displayed corresponds to the fully open PD output of the coils
Attachment #2: Fine pitch balancing optical lever setup
Attachment #3: Tower assembly
Attachment #4: SIDE OSEM close-up
Attachment #5: UR OSEM close-up
Attachment #6: UL OSEM close-up
Attachment #7: LL OSEM close-up (this is the concerning one)
Attachment #8: LR OSEM close-up
We should also check the following (I forgot and don't want to wear my clean jumpsuit again now to take more photos):
- Wire is still in groove
- Standoff is sitting on the optic barrel and not on epoxy residue of the guiderod
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|