40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Mon Jul 4 10:30:37 2016, ericq, Update, General, Preliminary vent plans
|
Tue Jul 5 17:14:02 2016, ericq, Update, General, Vent progress 
|
Tue Jul 5 19:10:41 2016, rana, Update, General, Vent progress
|
Tue Jul 5 21:51:35 2016, ericq, Update, General, Vent progress
|
Tue Jul 5 23:38:42 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Wed Jul 6 22:58:01 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Thu Jul 7 00:25:07 2016, ericq, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Thu Jul 7 10:49:03 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Fri Jul 8 11:35:45 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Fri Jul 8 11:48:09 2016, Koji, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Fri Jul 8 14:03:26 2016, ericq, Update, General, ETMX removed from suspension
|
Fri Jul 8 16:33:26 2016, ericq, Update, General, ETMX removed from suspension
|
Fri Jul 8 20:44:09 2016, Koji, Update, General, ETMX removed from suspension 6x
|
Sun Jul 10 15:38:01 2016, ericq, Update, General, ETMX in guiderod/standoff gluing fixture 6x
|
Tue Jul 12 16:08:00 2016, ericq, Update, General, ETMX ruby guided gluing
|
Wed Jul 13 21:13:51 2016, Koji, Update, General, ETMX guide rod gluing / ETMY Magnet gluing 13x
|
Thu Jul 14 22:29:57 2016, ericq , Update, General, ETMX guide rod gluing / ETMY Magnet gluing
|
Fri Jul 15 16:23:51 2016, ericq , Update, General, Gluing setbacks 
|
Tue Jul 19 16:39:29 2016, Lydia, Update, General, ETMX magnet gluing/guiderod excess glue removed 
|
Wed Jul 20 13:58:55 2016, Steve, Update, SUS, SUS damping out of vac chamber   
|
Thu Jul 21 17:01:59 2016, ericq, Update, General, ETMX magnet gluing/guiderod excess glue removed
|
Fri Jul 22 23:03:23 2016, gautam, Update, General, ETMX suspension - progress    
|
Sun Jul 24 03:43:56 2016, ericq, Update, General, Magnet positioning
|
Mon Jul 25 13:01:49 2016, ericq, Update, General, ETMX suspension - progress    
|
Mon Jul 25 13:47:19 2016, rana, Update, General, ETMX suspension - progress
|
Mon Jul 25 17:01:54 2016, Steve, Update, SUS, ETMX suspension - progress
|
Mon Jul 25 20:37:46 2016, gautam, Update, General, ETMX suspension - Side OSEM test
|
Tue Jul 26 18:07:57 2016, gautam, Update, General, ETMX suspension - Further OSEM Tests
|
Thu Jul 28 03:22:28 2016, ericq, Update, General, ETMX magnets re-reglued
|
Thu Jul 28 13:49:44 2016, gautam, Update, General, ETMX magnets re-reglued 
|
Thu Jul 28 17:48:17 2016, gautam, Update, General, ETMY LR magnet broke off
|
Thu Jul 28 22:43:03 2016, rana, Update, General, ETMY UL magnet broke off
|
Wed Aug 3 10:52:03 2016, Steve, Update, General, ETMY soaking dish  
|
Fri Jul 29 03:32:30 2016, ericq, Update, General, ETMX suspended once more
|
Fri Jul 29 13:17:34 2016, Koji, Update, General, Oven
|
Thu Jul 14 01:00:33 2016, Koji, Update, General, ETMX ruby guided gluing
|
Thu Jul 28 16:43:01 2016, Lydia, Update, General, ETMX aluminium standoff groove condition   
|
Fri Jul 8 21:22:38 2016, gautam, Update, General, Vent progress - ETMX SUS Coil driver electronics investigation
|
Wed Jul 6 09:34:26 2016, Steve, Update, General, PRM sensing voltage LR
|
Wed Jul 6 19:36:45 2016, Koji, Update, General, SUS Vmon  
|
Thu Jul 7 15:23:39 2016, ericq, Update, General, SUS Vmon
|
Thu Jul 7 16:05:55 2016, Koji, Update, General, SUS Vmon
|
Thu Jul 7 17:12:50 2016, Johannes, Update, General, Vent progress   
|
Tue Jul 12 23:51:16 2016, Johannes, Update, General, Vent progress - ETMY inspection 
|
Wed Jul 13 00:38:25 2016, Johannes, Update, General, Vent progress - ETMY attempted repositioning
|
Tue Jul 19 13:21:42 2016, Johannes, Update, General, Vent progress - ETMY attempted repositioning
|
Sun Jul 10 17:33:00 2016, ericq, Update, General, Vent progress
|
Mon Jul 11 15:13:22 2016, gautam, Update, General, Vent progress: in-date First Contact procured
|
|
Message ID: 12292
Entry time: Tue Jul 12 16:08:00 2016
In reply to: 12283
Reply to this: 12300
12301
|
Author: |
ericq |
Type: |
Update |
Category: |
General |
Subject: |
ETMX ruby guided gluing |
|
|
[ericq, Koji]
We have positioned and applied epoxy to one ruby standoff on ETMX, for overnight curing according to the SOS standoff gluing procedure. This included:
- Removing and reinserting the guiderod until the groove is properly oriented, as seen by microscope
- finding the right vertical offset with the microscope + 3 axis micrometer stage
- axial centering by equalizing the distances from the grove to each bevelled edge of the barrel with the microscope stage
- mixing epoxy
- Testing the mix by putting some drops on some foil, and putting that in a 200F oven for 15 minutes, and checking that it cured well
- Applying some tiny droplets of expoxy using the tip of some copper wire, making an effort to keep epoxy away from the glue
Instead of trying to fix up a way of gluing the guiderod with the proper alignment, we chose to be more conservative and glue the standoff today, then switch the gluing fixture's arms tomorrow to glue the guide rod with the good fixture arm.
Additionally, we chose to glue one of the more assymetric standoffs on this first side. What I mean by this is: We have 3 ruby standoffs with grooves. Two of them have the groove about 1/8th of the way along their length, and one has it about 1/4 of the way. Since the second standoff is going to be glued while suspended, after pitch balancing, we figure that we want to use the more centered groove on that side, meaning we used one of the 1/8th standoffs today.
Unfortunately, we neglected to take any pictures :/ |