40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon May 2 17:11:55 2016, rana, Update, COC, RC folding mirrors 
    Reply  Wed May 18 01:10:22 2016, gautam, Update, COC, Finesse modelling arms.pdfPRC.pdfSRC.pdfFinesse_model.zip
       Reply  Tue May 24 22:49:02 2016, gautam, Update, COC, Finesse modelling - mode overlap scans 9x
          Reply  Tue May 24 23:17:37 2016, ericq, Update, COC, Finesse modelling - mode overlap scans 
             Reply  Thu Jun 16 15:57:46 2016, gautam, Update, COC, Contrast as a function of RoC of ETMX contrastDefect.pdffinesseCode.zip
                Reply  Thu Jun 16 18:42:12 2016, rana, Update, COC, Contrast as a function of RoC of ETMX 
                   Reply  Thu Jun 16 23:02:57 2016, gautam, Update, COC, Contrast as a function of RoC of ETMX contrastDefect.pdf
                      Reply  Mon Jun 20 01:38:04 2016, rana, Update, COC, Contrast as a function of RoC of ETMX 
                         Reply  Mon Jun 20 18:07:15 2016, gautam, Update, COC, Contrast as a function of RoC of ETMX contrastDefectComparison.pdf
             Reply  Tue Jun 28 16:06:09 2016, gautam, Update, COC, RC folding mirrors - further checks C1_HOMcurves_Y.pdfC1_HOMcurves_DR.pdf
                Reply  Thu Jun 30 16:21:32 2016, gautam, Update, COC, Sideband HOMs resonating in arms image.jpegC1_HOMcurves_Y.pdfC1_HOMcurves_X.pdf
                Reply  Sat Aug 13 18:25:22 2016, gautam, Update, COC, RC folding mirrors - Numerical review PRX_consolidated.pdfSRX_consolidated.pdfGouy_PRC.pdfGouy_SRC.pdf
                   Reply  Tue Aug 16 11:51:43 2016, gautam, Update, COC, RC folding mirrors - Numerical review PRC_consolidated.pdfSRC_consolidated.pdfGouyPRC.pdfGouySRC.pdf
                      Reply  Tue Aug 16 16:38:00 2016, gautam, Update, COC, RC folding mirrors - Numerical review PRC_consolidated.pdfSRC_consolidated.pdfGouyPRC.pdfGouySRC.pdf
                         Reply  Wed Aug 17 14:37:36 2016, gautam, Update, COC, RC folding mirrors - Numerical review PRG.pdf
                            Reply  Wed Aug 17 16:28:46 2016, Koji, Update, COC, RC folding mirrors - Numerical review 
                            Reply  Mon Nov 21 15:34:24 2016, gautam, Update, COC, RC folding mirrors - updated specs Recycling_Mirrors_Specs_Nov2016.pdf
                               Reply  Thu Feb 23 10:59:53 2017, gautam, Update, COC, RC folding mirrors - coating optimization PR3_R_170222_2006.pdfPR3_123_TOnoise_170222_2203.pdfPR3_123_Layers_170222_2203.pdfPR3AR_R_170222_2258.pdfPR3AR_123_Layers_170222_2258.pdf
                                  Reply  Tue Mar 14 10:56:33 2017, gautam, Update, COC, RC folding mirrors - coating optimization PR3_R_170313_1701.pdfPR3AR_123_Layers_170313_1701.pdfPR3AR_R_170313_1752.pdfPR3AR_123_Layers_170313_1752.pdf
                                     Reply  Mon Apr 10 15:37:11 2017, gautam, Update, COC, RC folding mirrors - v3 of specs uploaded  8x
Message ID: 12194     Entry time: Thu Jun 16 23:02:57 2016     In reply to: 12193     Reply to this: 12197
Author: gautam 
Type: Update 
Category: COC 
Subject: Contrast as a function of RoC of ETMX 
Quote:

That sounds weird. frownIf the ETMY RoC is 60 m, why would you use 57.6 m in the simulation? According to the phase map web page, it really is 60.2 m.

This was an oversight on my part. I've updated the .kat file to have all the optics have the RoC as per the phase map page. I then re-did the tracing of the Y arm cavity mode to determine the appropriate beam parameters at the laser in the simulation, and repeated the sweep of RoC of ETMX while holding RoC of ETMY fixed at 60.2m. The revised contrast defect plot is attached (this time it is the contrast defect, and not the contrast, but since I was running the simulation again I thought I may as well change the plot). 

As per this plot, if the ETMX RoC is ~54.8m (the closer of the two spares to 60.2m), the contrast defect is 0.9%, again in good agreement with what the note linked in the previous elog tells us to expect...

Attachment 1: contrastDefect.pdf  14 kB  | Show | Show all
ELOG V3.1.3-