Fri Dec 26 17:45:21 2014, Steve, Update, VAC, vac pressure rose to 1.3 mTorr 
|
Sun Dec 28 07:29:16 2014, Steve, Update, VAC, vacuum is normal
|
Tue Feb 3 15:20:13 2015, Steve, Koji, Update, VAC, Pneumatic pressure is being read again
|
Sun Mar 22 18:42:40 2015, Steve, Update, VAC, vac pressure rose to 1.2mTorr 
|
Mon Mar 23 10:36:55 2015, ericq, Update, VAC, Pressure watch script
|
Fri Apr 24 17:30:32 2015, Jenne, Update, VAC, Pressure watch script broken
|
Sat Apr 25 18:50:47 2015, ericq, Update, VAC, Pressure watch script broken
|
Sat Apr 25 22:17:49 2015, rana, Update, CDS, MXstream restart script working (beta)
|
Tue May 19 17:03:34 2015, Koji, Update, CDS, MXstream restart script working (beta)
|
Tue May 19 18:38:33 2015, rana, Update, CDS, MXstream restart script working (beta)
|
Mon Apr 27 14:37:55 2015, Steve, Update, VAC, N2 pneumatic pressure watch
|
Thu Apr 30 16:30:25 2015, Steve, Update, VAC, N2 pneumatic pressure watch set up
|
Tue Jan 31 14:14:29 2017, rana, Update, VAC, Pressure watch script
|
Sun May 15 19:48:08 2016, Steve, Update, VAC, run out of N2
|
Tue Jun 14 10:13:34 2016, Steve, Update, VAC, temporary N2 supply line
|
Fri Jun 17 15:22:31 2016, gautam, Update, VAC, N2 supply line restored after retiling
|
|
Message ID: 12174
Entry time: Tue Jun 14 10:13:34 2016
In reply to: 12117
Reply to this: 12195
|
Author: |
Steve |
Type: |
Update |
Category: |
VAC |
Subject: |
temporary N2 supply line |
|
|
The drill room floor will be retiled Thursday, June 16. Temporary nitrogen line set up will allow emptying the hole area.
Ifo room entry will be through control room.
|
|
|