Thu Mar 10 16:29:32 2016, gautam, Update, endtable upgrade, Inventory check 
|
Thu Mar 10 16:32:45 2016, rana, Update, endtable upgrade, Inventory check
|
Mon Mar 14 22:42:23 2016, gautam, Update, endtable upgrade, Inventory check
|
Mon Mar 28 10:43:18 2016, Steve, Update, endtable upgrade, ETMX 4'x2' optical table pictures  
|
Wed Mar 30 17:38:52 2016, gautam, Update, endtable upgrade, X end table proposed layout  
|
Thu Mar 31 09:38:41 2016, Steve, Update, endtable upgrade, Y end 4x3 existing layout
|
Thu Mar 31 19:49:31 2016, gautam, Update, endtable upgrade, proposed layout v2
|
Mon Apr 4 10:59:12 2016, gautam, Update, endtable upgrade, proposed layout v3    
|
Mon Apr 4 15:04:14 2016, gautam, Update, endtable upgrade, COMPONENT REMOVAL
|
Tue Apr 5 11:42:17 2016, gaericqutam, Update, endtable upgrade, TABLE REMOVAL
|
Wed Apr 6 17:52:21 2016, gautam, Update, endtable upgrade, First contact cleaning commenced
|
Thu Apr 7 12:51:24 2016, gautam, Update, endtable upgrade, Beam height differences
|
Thu Apr 7 14:30:58 2016, Steve, Update, endtable upgrade, ETMX table height    
|
Fri Apr 8 09:13:20 2016, Steve, Update, endtable upgrade, ETMX-T beam height 
|
|
Message ID: 12056
Entry time: Wed Mar 30 17:38:52 2016
In reply to: 12051
Reply to this: 12057
|
Author: |
gautam |
Type: |
Update |
Category: |
endtable upgrade |
Subject: |
X end table proposed layout |
|
|
Attachment 1: This is a photo of the current X end table optical layout with the beampaths of the various sub-systems overlaid. For the labels, see Attachment #2.
Attachment 2: This is a summary of all the optical components that are currently being used. I've noted some things we may want to change when we effect the swap. The important ones are:
- Switch out all 1" and 2" optic mounts which are not of the Polaris type to the Polaris type. I have checked that we have sufficient numbers of these in hand.
- Adjust the collimating lens of the fiber collimating telescope to get a better mode
- Many of the labels are probably outdated, now would be a good time to update them
- For the mode-matching of the AUX IR into the doubling crystal, a la mode suggests a better (i.e. less sensitive to lens position) solution is effected with L2 as a 100mm fl lens rather than 88.3mm. I did not change this during the laser swap in order to minimize the number of components changed. Since we are doing a wholesale change now, it may not be a bad idea to swap this out as well. I have checked that we have a suitable AR1064 coated lens.
- Some optics probably need to be cleaned...
- PZT mirror 2 has a new mount ready that is the "correct" height so we don't have to keep using makeshift stacked posts.
- The plan as it stands is to use the green coloured mount for the IR faraday (IO-5-1064-HP).
Have I missed anything important?
Attachment #3: I've made a CAD drawing of the proposed new layout and have overlaid the beampath in an amateur way because I couldn't figure OptoCad out - I figure this will suffice for now. I have adopted elements from the current Y-end layout, but have used Anders' mode-matching solution (same lenses, same positions of optics) to make sure we have good Guoy phase separation between the two PZT steering mirrors. Some notes:
- I've tried to palce the optics for the AUX IR into the doubler and subsequent steering of green into the arm cavity as per the mode matching solution. These should be pretty accurate, and the layout suggests we have some room to maneuver
- The Green REFL beampath is exaggerated but I think we have enough room to place Y16 appropriately and steer the reflected beam into the PDA36A
- We need two more 1" 1064nm coated mirrors for the initial steering into the doubling oven, I have checked we have these in hand.
- The IR pickoff into the fiber coupler may change somewhat once we change the mode and redo the mode-matching calculations. But again, I think we have sufficient room to implement a workable solution.
- After accounting for the fact that the new endtable will be a little closer to the vacuum chamber, Y12 in the proposed layout will be ~10cm further away from ETMX than it is currently. But as discussed at the meeting today, the Rayleigh range of the green beam should be large enough here such that this shouldn't be a significant change.
Steve says the table is ready - so if we are happy with this layout, we can move forward... |
|
|
|
|
|