Entry  Tue Feb 2 18:35:47 2016, gautam, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table 
    Reply  Tue Feb 2 18:54:02 2016, Koji, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table 
       Reply  Wed Feb 3 23:23:47 2016, gautam, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table KnifeEdgeScans_x.pdfBeamscan_x.pdf
          Reply  Thu Feb 4 09:16:46 2016, Koji, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table 
             Reply  Fri Feb 5 00:23:01 2016, gautam, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table Beamscan_setup.pdfBeamscan_x.pdfBeamscan_y.pdfZscan.pdf
                Reply  Fri Feb 5 16:50:24 2016, gautam, Update, Green Locking, First pass at mode-matching Modematch_AUXx.pdfNewSetUp.pngModematch_AUXx_2.pdfXendModeMatch.m.zip
                   Reply  Mon Feb 8 15:36:37 2016, gautam, Update, Green Locking, Alternative mode-matching scheme Modematch_alternative.pdf
                      Reply  Tue Feb 9 04:37:10 2016, ericq, Update, Green Locking, Laser swap initiated 
                         Reply  Tue Feb 9 11:49:47 2016, gautam, Update, Green Locking, Laser swap initiated Innolight_beamProfile.pdf
                            Reply  Tue Feb 9 19:15:36 2016, gautam, Update, Green Locking, Laser swap - updates Modematch_X.pdfXendModeMatch.m.zip
                               Reply  Wed Feb 10 17:57:15 2016, gautam, Update, Green Locking, Laser swap - updates 
                                  Reply  Fri Feb 12 17:05:40 2016, gautam, Update, Green Locking, Laser swap - green light recovered but no flashes in the arm 
                                     Reply  Fri Feb 12 19:07:52 2016, Koji, Update, Green Locking, Laser swap - green light recovered but no flashes in the arm 
                                        Reply  Fri Feb 19 00:42:19 2016, gautam, Update, Green Locking, Laser swap - beam ellipticity from laser? IMG_6287.JPGIMG_6288.JPGIMG_6286.JPG
                                           Reply  Mon Feb 22 13:56:52 2016, gautam, Update, Green Locking, Laser swap -reflected beam from ETM aligned 
                                              Reply  Tue Feb 23 23:01:16 2016, gautam, Update, Green Locking, Laser swap - Green PDH locking AM_scan.pdfAM_scan_zoomed.pdf
                                                 Reply  Wed Feb 24 19:29:13 2016, gautam, Update, Green Locking, Laser swap - Green PDH locked 
                                                    Reply  Fri Feb 26 01:52:44 2016, gautam, Update, Green Locking, Laser swap - Green PDH OLTF X_PDH_OLTF_20160225.pdf
                                                       Reply  Mon Feb 29 17:17:26 2016, gautam, Update, Green Locking, Laser swap - still no green beatnote 
                                                          Reply  Wed Mar 2 17:42:19 2016, gautam, Update, Green Locking, Laser swap - some progress 
                                                             Reply  Thu Mar 3 01:25:50 2016, gautam, Update, Green Locking, Laser swap - 2 IR + 1 green beatnotes found IR_beat_20160303_2.pdf
                                                                Reply  Fri Mar 4 01:11:41 2016, gautam, Update, Green Locking, Laser swap - both green beatnotes found IR_beat_20160303_green.pdf
                                                                   Reply  Sat Mar 5 23:31:01 2016, gautam, Update, Green Locking, Laser swap - some updates AUXxTelescope.png.pngPM_setup.pdfPLLolg.pdfAMPM20160303.pdfIRbeat_20160304.pdf
                                                                      Reply  Mon Mar 7 23:51:36 2016, gautam, Update, Green Locking, Laser swap - some improvement PomonaTF.pdfXPDH.pdfYPDH.pdfgreenbeat_20160307.pdf
                                                                         Reply  Tue Mar 8 18:22:20 2016, rana, Update, Green Locking, Laser swap - some improvement 
Message ID: 12013     Entry time: Mon Feb 29 17:17:26 2016     In reply to: 12012     Reply to this: 12016
Author: gautam 
Type: Update 
Category: Green Locking 
Subject: Laser swap - still no green beatnote 

I continued the hunt for a green beatnote today - I decided to take the output from the RF amplifiers sitting on the PSL table and directly connect it to the analyzer in the control room while I swept the temperature of the end laser 10,000 counts on either side of a temperature at which I had taken this measurement - so I expect the beatnote should be found somewhere in this neighbourhood. But I did not see any peaks throughout the sweep. I re-checked that the mode overlap onto the BBPD is reasonable. We have considerably less transmitted green power from the arm now than we did before the laser swap (by a factor of ~3) but I still expected to see some sort of beat signal.

It would be handy to have the IR beat set up as well for this process, but as mentioned in a previous elog, I was getting only ~0.1 mW of IR power incident on the coupler at the end table last week. As I had suspected, tweaking the alignment of the steering optics for the pick-off IR beam after the doubler improved the situation somewhat, and I am now getting about 1mW of IR power incident on the coupler at the end table. But I've not been able to adjust the alignment into the fiber at the end such that I get any IR light at the PSL table.  

ELOG V3.1.3-