Entry  Tue Feb 2 18:35:47 2016, gautam, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table 
    Reply  Tue Feb 2 18:54:02 2016, Koji, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table 
       Reply  Wed Feb 3 23:23:47 2016, gautam, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table KnifeEdgeScans_x.pdfBeamscan_x.pdf
          Reply  Thu Feb 4 09:16:46 2016, Koji, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table 
             Reply  Fri Feb 5 00:23:01 2016, gautam, Update, Green Locking, Lightwave NPRO moved from PSL table to SP table Beamscan_setup.pdfBeamscan_x.pdfBeamscan_y.pdfZscan.pdf
                Reply  Fri Feb 5 16:50:24 2016, gautam, Update, Green Locking, First pass at mode-matching Modematch_AUXx.pdfNewSetUp.pngModematch_AUXx_2.pdfXendModeMatch.m.zip
                   Reply  Mon Feb 8 15:36:37 2016, gautam, Update, Green Locking, Alternative mode-matching scheme Modematch_alternative.pdf
                      Reply  Tue Feb 9 04:37:10 2016, ericq, Update, Green Locking, Laser swap initiated 
                         Reply  Tue Feb 9 11:49:47 2016, gautam, Update, Green Locking, Laser swap initiated Innolight_beamProfile.pdf
                            Reply  Tue Feb 9 19:15:36 2016, gautam, Update, Green Locking, Laser swap - updates Modematch_X.pdfXendModeMatch.m.zip
                               Reply  Wed Feb 10 17:57:15 2016, gautam, Update, Green Locking, Laser swap - updates 
                                  Reply  Fri Feb 12 17:05:40 2016, gautam, Update, Green Locking, Laser swap - green light recovered but no flashes in the arm 
                                     Reply  Fri Feb 12 19:07:52 2016, Koji, Update, Green Locking, Laser swap - green light recovered but no flashes in the arm 
                                        Reply  Fri Feb 19 00:42:19 2016, gautam, Update, Green Locking, Laser swap - beam ellipticity from laser? IMG_6287.JPGIMG_6288.JPGIMG_6286.JPG
                                           Reply  Mon Feb 22 13:56:52 2016, gautam, Update, Green Locking, Laser swap -reflected beam from ETM aligned 
                                              Reply  Tue Feb 23 23:01:16 2016, gautam, Update, Green Locking, Laser swap - Green PDH locking AM_scan.pdfAM_scan_zoomed.pdf
                                                 Reply  Wed Feb 24 19:29:13 2016, gautam, Update, Green Locking, Laser swap - Green PDH locked 
                                                    Reply  Fri Feb 26 01:52:44 2016, gautam, Update, Green Locking, Laser swap - Green PDH OLTF X_PDH_OLTF_20160225.pdf
                                                       Reply  Mon Feb 29 17:17:26 2016, gautam, Update, Green Locking, Laser swap - still no green beatnote 
                                                          Reply  Wed Mar 2 17:42:19 2016, gautam, Update, Green Locking, Laser swap - some progress 
                                                             Reply  Thu Mar 3 01:25:50 2016, gautam, Update, Green Locking, Laser swap - 2 IR + 1 green beatnotes found IR_beat_20160303_2.pdf
                                                                Reply  Fri Mar 4 01:11:41 2016, gautam, Update, Green Locking, Laser swap - both green beatnotes found IR_beat_20160303_green.pdf
                                                                   Reply  Sat Mar 5 23:31:01 2016, gautam, Update, Green Locking, Laser swap - some updates AUXxTelescope.png.pngPM_setup.pdfPLLolg.pdfAMPM20160303.pdfIRbeat_20160304.pdf
                                                                      Reply  Mon Mar 7 23:51:36 2016, gautam, Update, Green Locking, Laser swap - some improvement PomonaTF.pdfXPDH.pdfYPDH.pdfgreenbeat_20160307.pdf
                                                                         Reply  Tue Mar 8 18:22:20 2016, rana, Update, Green Locking, Laser swap - some improvement 
Message ID: 11985     Entry time: Wed Feb 10 17:57:15 2016     In reply to: 11984     Reply to this: 11988
Author: gautam 
Type: Update 
Category: Green Locking 
Subject: Laser swap - updates 

After the discussion at the meeting, I decided to go ahead and open the top of the oven so that I could get a visual on where the crystal was located - this helped in the alignment, and I was able to get some green light out of the oven. I had to tweak the position of the Doubling oven a little (with the top open) in order to align the crystal to the beam axis. However - I was only able to get ~140uW of green light going into the Faraday. I had measured the power at various points along the beam path recently with the old setup. We used to have ~860uW of green going into the Faraday there. To see if I could improve the situation a little, I checked that the beam was reasonably centered on both apertures of the IR Faraday, and then removed the irides upstream of the doubling oven. These were preventing me from placing the lenses exactly as per the a la mode solution. Once the irides were removed, I moved the lenses to their optimal positions as best as I could with a tape measure to mark out distances. I then further tweaked the position of the doubling oven using the 4 axis stage, monitoring the green power while doing so. The best I could get was ~200uW. Perhaps the positions of the lenses need to be optimized further. I also checked the IR power before and after the IR Faraday - these numbers are ~260mW and ~230mW respectively (I maximized the transmitted power through the Faraday by rotating the HWP, the QWP that was in the beam path has now been removed as the Lightwave outputs linearly polarized light), and compare favourably to the numbers in the old setup. Doing a naive scaling accounting for the fact that we have less power going into the doubling crystal, I would expect ~700uW of green light coming out, so it looks like the mode matching into the doubling crystal is indeed sub-optimal. However, now that things are roughly aligned, I hope the optimization will go faster...

ELOG V3.1.3-