40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log |
Not logged in |
 |
|
Fri Nov 13 22:32:54 2015, Koji, Summary, PSL, PMC LO degraded, usual ERA-5 replacement, LO recovered    
|
Sun Nov 15 22:43:48 2015, Koji, Summary, PSL, PMC LO degraded, usual ERA-5 replacement, LO recovered 
|
Mon Nov 16 19:05:59 2015, Koji, Summary, PSL, PMC servo circuit review, follow up measurements
|
Mon Nov 16 21:32:49 2015, Koji, Summary, PSL, PMC servo circuit review, follow up measurements
|
Tue Nov 17 16:21:10 2015, Koji, Summary, PSL, PMC servo circuit review, follow up measurements
|
Wed Nov 18 16:51:58 2015, Koji, Summary, PSL, PMC servo calibration
|
Wed Nov 18 16:53:17 2015, Koji, Summary, PSL, PMC PZT capacitance
|
Wed Nov 18 17:09:22 2015, Koji, Summary, PSL, PMC Servo analysis 
|
Fri Nov 20 15:44:12 2015, Koji, Summary, PSL, Added 17.5kHz LPF to the PMC servo 
|
|
Message ID: 11765
Entry time: Sun Nov 15 22:43:48 2015
In reply to: 11763
Reply to this: 11768
|
Author: |
Koji |
Type: |
Summary |
Category: |
PSL |
Subject: |
PMC LO degraded, usual ERA-5 replacement, LO recovered |
|
|
I think the IMC locking was somewhat improved. Still it is not solid as long time before.
Before the PMC fix (attachment 1)
After the PMC fix (attachment 2)
To do
- PMC loop inspection / phase check / spectral measurements
- PMC / IMC interaction
- IMC loop check
|
|
|
|
|