40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Sep 16 03:44:18 2015, Koji, Update, LSC, RF micky mouse IMG_20150915_231038191.jpgIMG_20150915_234257144.jpg
    Reply  Thu Sep 17 17:27:01 2015, gautam, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed DIN_rail_terminal.jpg
       Reply  Thu Sep 17 19:42:43 2015, Koji, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed IMG_20150917_190635033.jpgIMG_20150917_192551919.jpg
       Reply  Fri Sep 18 08:03:53 2015, rana, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed 
       Reply  Fri Sep 18 08:04:09 2015, rana, Update, LSC, RF micky mouse - dodgy DIN connector blocks fixed 
Message ID: 11617     Entry time: Fri Sep 18 08:04:09 2015     In reply to: 11613
Author: rana 
Type: Update 
Category: LSC 
Subject: RF micky mouse - dodgy DIN connector blocks fixed 

Steve and I turned on the box this morning so that the IMC would lock again.

For future reference, remember that one should turn off the Marconi output before turning off the RF distribution box. Don't drive the input of unpowered RF amps.

 

ELOG V3.1.3-