Message ID: 11440     Entry time: Thu Jul 23 20:54:42 2015
Author: Jessica 
Type: Update 
Category: General 
Subject: ALS Delay Line Box 

The front panels for the ALS delay line box came in last week. Some of the holes for the screws were slightly misaligned, so I filed those and everything is now put together. I just need to test both front panels to determine if the SMAs should be isolated or not.

 

Koji had also suggested making the holes in the front and back panel conical recesses so that flat head screws could be used and would counteract the anodization of the panel and avoid the SMAs being isolated. I think if we did that then conductivity would be ensured throughout the panel and also through the rest of the box. I also think one way we could test this before drilling conical recesses would be to test both front panels now, as one has isolated SMAs and one has conductive SMAs. If the anodization of the panel isolated the SMA regardless, we could potentially figure this out by testing both panels. But, would it also be that it is possible that the isolation of the SMA itself does not matter and so this test would tell us nothing? Is there a better way to test if the SMAs are being isolated or not? Or would this be more time consuming than just drilling conical recesses as a preventative measure?

ELOG V3.1.3-