40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Mon Jun 1 10:26:53 2015, ericq, Update, CDS, RCG Upgrade Imminent 
    Reply  Mon Jun 1 20:05:36 2015, rana, Update, CDS, RCG Upgrade Imminent 
    Reply  Mon Jun 8 15:51:31 2015, ericq, Update, CDS, RCG Diagnostics newTST.png
       Reply  Wed Jul 22 14:10:04 2015, ericq, Update, CDS, RCG Diagnostics filterShapes.pngCDS_diag_codes.zip
Message ID: 11342     Entry time: Mon Jun 1 20:05:36 2015     In reply to: 11340
Author: rana 
Type: Update 
Category: CDS 
Subject: RCG Upgrade Imminent 

yes

Quote:

 

Additionally, we want to have some set of tests and diagnostics, to make sure we have not introduced unwanted behavior. 

To this end I will create some test models and DTT templates, where a series of measurements can be run, like

  • OLTF/delay measurement of a single all-digital loop within one model
  • OLTF/delay measurements of a few all-digital loops split across two models, using IPC communcation, RFM, dolphin
  • Hook up DAC -> resistor/amplifier/??? -> ADC, to check things like DAC output, ADC noise levels, IOP delays.

I'll run these test before touching anything, and make sure I understand all of the results, so that an apples-to-apples comparison can be made after the upgrade is complete. 

I got goosebumps just imagining this.

ELOG V3.1.3-