Message ID: 11340     Entry time: Mon Jun 1 10:26:53 2015     Reply to this: 11342   11347
Author: ericq 
Type: Update 
Category: CDS 
Subject: RCG Upgrade Imminent 

We are planning on upgrading the 40 CDS system to the latest version of the LIGO RCG software, in three weeks when Jamie is back in town. 

Jamie and I spoke last week, to hash out a general plan for upgrade and preperations I can make in the meantime. 


Preparation of our models for the upgrade includes;

  • Check if any of the default RCG parts (filter modules, etc.) have substantially different default behavior / ports
  • Cleaning up unterminated/hanging connections in the diagrams (Jamie tells me RCG is more strict about this now)
  • Going through all of the build logs for our models to find what custom blocks are being pulled in from the userapps svn
  • Confirm all of our running blocks and models are committed to svn 
  • In a new, isolated, folder, checkout the latest version of the userapps repo
  • See what blocks have changed, and what model changes might be neccesary. 

Once we think we know what needs to be changed in our models, we can check out the latest version of the RCG source, without linking it as the active version, and create a new build directory, without touching the old one, and create new copies of the 40m models with the neccesary modifications. This way, we can work on getting all of the 40m models compiled, without touching any of the live, running, systems

Once our models are compiling successfully, we can work on building daqd, nds, mxstream, etc. 


Additionally, we want to have some set of tests and diagnostics, to make sure we have not introduced unwanted behavior. 

To this end I will create some test models and DTT templates, where a series of measurements can be run, like

  • OLTF/delay measurement of a single all-digital loop within one model
  • OLTF/delay measurements of a few all-digital loops split across two models, using IPC communcation, RFM, dolphin
  • Hook up DAC -> resistor/amplifier/??? -> ADC, to check things like DAC output, ADC noise levels, IOP delays.

I'll run these test before touching anything, and make sure I understand all of the results, so that an apples-to-apples comparison can be made after the upgrade is complete. 


Updates will be posted as I hash things out. I'm sure we have not yet thought of everything to think about and test, so ideas and feedback are very welcome. 