40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Apr 1 10:50:59 2015, Steve, Update, PEM, construction ahead largeMITchamber.jpg
    Reply  Mon Apr 6 09:13:49 2015, Steve, Update, PEM, jackhammering at ETMX jackhammerCalb.pngjackHcalETMX.jpgjackHetmx.png
       Reply  Mon Apr 6 13:23:40 2015, rana, Update, PEM, jackhammering at ETMX 
          Reply  Tue Apr 7 04:17:42 2015, Jenne, Update, PEM, jackhammering at ETMX 
             Reply  Thu Apr 9 07:41:22 2015, Steve, Update, PEM, jackhammering at ETMX moreJackHam.pngGTRX.jpg
    Reply  Tue Apr 14 11:19:52 2015, Steve, Update, PEM, large chamber has arrived ETMXfriend.png8000lbs.png
Message ID: 11211     Entry time: Thu Apr 9 07:41:22 2015     In reply to: 11205
Author: Steve 
Type: Update 
Category: PEM 
Subject: jackhammering at ETMX 

There was a period of short unexpected jackhammering this morning. I asked them to stop.

The good mood of GTRX was not changed.smiley

 

Attachment 1: moreJackHam.png  92 kB  | Hide | Hide all
moreJackHam.png
Attachment 2: GTRX.jpg  53 kB  Uploaded Thu Apr 9 09:24:42 2015  | Hide | Hide all
GTRX.jpg
ELOG V3.1.3-