40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Feb 25 14:35:32 2015, Steve, Update, safety, safety audit 2015 safety2015audit.jpg
    Reply  Fri Feb 27 14:17:51 2015, Steve, Update, safety, safety audit 2015 1064Tchecked.jpg
       Reply  Tue Mar 3 11:38:11 2015, Steve, Update, safety, professional crane inspection 450lbs2015.jpg
          Reply  Wed Mar 2 10:09:28 2016, Steve, Update, safety, professional crane inspection 
             Reply  Fri Mar 4 11:07:10 2016, Steve, Update, safety, crane inspection completes 2016 safey audit craneInsp2016.jpg
                Reply  Mon Mar 6 09:12:59 2017, Steve, Update, safety, crane inspection 2017 inspection_2017.jpg
                   Reply  Mon Feb 12 14:56:00 2018, Steve, Update, safety, crane inspection 2018 ETMY.jpgVetex.jpgETMX.jpg
       Reply  Wed Feb 24 10:27:23 2016, Steve, Update, safety, safety audit 2016 audit2016.jpg
          Reply  Thu Mar 3 10:19:20 2016, Steve, Update, safety, safety audit 2016 checkedSG.jpg
          Reply  Tue Apr 19 10:58:53 2016, Steve, Update, safety, safety scans at PSL & tables 
Message ID: 11068     Entry time: Wed Feb 25 14:35:32 2015     Reply to this: 11085
Author: Steve 
Type: Update 
Category: safety 
Subject: safety audit 2015 

Safety audit went soothly. We thank all participients.

Correction list:

1, Bathroom water heater cable to be stress releived and connector replaced by twister lock type.

2, Floor cable bridge at the vacuum rack to be replaced. It is cracked.

3, Sprinkler head to be moved eastward 2 ft in room 101

4, Annual crane inspection is scheduled for 8am Marc 3, 2015

5, Annual safety glasses cleaning and transmission measurement will get done tomorrow morning.

Attachment 1: safety2015audit.jpg  131 kB  | Hide | Hide all