Entry  Wed Nov 12 18:08:35 2014, Jenne, Update, LSC, RIN in transmission a problem? RIN_TRX_TRY_MCtrans_12Nov2014_zip.xml.gzRIN_TRX_TRY_MCtrans_12Nov2014.pdfRINcontribution_12Nov2014_linearXscale.pngRINcontribution_12NOv2014_logXscale.png
    Reply  Thu Nov 13 01:00:37 2014, rana, Update, LSC, RIN in transmission a problem? 
    Reply  Thu Nov 13 04:28:28 2014, Jenne, Update, LSC, RIN in transmission a problem? zippyzip.zipRIN_TRX_TRY_IPPOS_NoLens_12Nov2014.pdf
       Reply  Thu Nov 13 23:42:01 2014, Jenne, Update, LSC, RIN vs. Seismic Seismic_TRXTRYandMC_13Nov2014.pdf
          Reply  Fri Nov 14 17:08:17 2014, Jenne, Update, LSC, RIN vs. Seismic 
       Reply  Fri Nov 14 20:31:13 2014, ericq, Update, LSC, RIN in transmission a problem? 
Message ID: 10707     Entry time: Thu Nov 13 01:00:37 2014     In reply to: 10703
Author: rana 
Type: Update 
Category: LSC 
Subject: RIN in transmission a problem? 

 

 I modified the MC2 trans optical setup a little bit: the reflection from the QPD was not dumped and so it was hitting the wall of the black box.

I angled the QPD slightly and moved the dump so that the reflection hit it. The leakage through the 50/50 steering mirror for the QPD was already being dumped and I made sure that that one stayed dumped on its razor dump. After doing this we turned off the WFS and re-aligned the MC2 trans beam onto the QPD to zero the pit/yaw signals. 