40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Wed Jul 2 11:32:44 2014, Jenne, TaraV, Update, PEM, Status of seismometer stations, Yend Guralp moved 
    Reply  Mon Jul 7 14:38:55 2014, Steve, Update, safety, safety training 
       Reply  Thu Dec 11 15:40:04 2014, Steve, Update, safety, safety training 
    Reply  Tue Aug 12 13:31:58 2014, Jenne, Update, PEM, Seismometer cables in place, ready for sensors 
       Reply  Thu Sep 25 11:38:47 2014, Jenne, Update, PEM, Seismometers in place 
Message ID: 10539     Entry time: Thu Sep 25 11:38:47 2014     In reply to: 10368
Author: Jenne 
Type: Update 
Category: PEM 
Subject: Seismometers in place 

[Zach, Jenne, Steve]

This work happened on Tuesday.  Bad Jenne for forgetting to elog it!

Zach brought the 40m's seismometers back (one Guralp and one T-240).  We have set the seismometers on their slabs.  Also, we ran the T240 cable from 1X5 over to the vertex slab.  Also, also, Zach and Steve mounted the T-240 readout box in the 1X5 rack.  We have not yet hooked it up to power, although there are fused power blocks available on that rack. 

So, the T-240 box needs power, and then we need to connect the seismometers to their respective boxes.  Also, we need to run medium-short BNC cables from the T-240 readout box to the PEM AA board over in 1X7.