[Zach, Jenne, Steve]
This work happened on Tuesday. Bad Jenne for forgetting to elog it!
Zach brought the 40m's seismometers back (one Guralp and one T-240). We have set the seismometers on their slabs. Also, we ran the T240 cable from 1X5 over to the vertex slab. Also, also, Zach and Steve mounted the T-240 readout box in the 1X5 rack. We have not yet hooked it up to power, although there are fused power blocks available on that rack.
So, the T-240 box needs power, and then we need to connect the seismometers to their respective boxes. Also, we need to run medium-short BNC cables from the T-240 readout box to the PEM AA board over in 1X7. |