Entry  Fri Sep 12 00:40:23 2014, Jenne, Update, LSC, DRMI locking 
    Reply  Fri Sep 12 11:25:42 2014, Koji, Update, LSC, DRMI locking 
       Reply  Fri Sep 12 12:00:59 2014, ericq, Update, LSC, DRMI locking 
    Reply  Fri Sep 12 14:11:17 2014, ericq, Update, LSC, DRMI locking 7x
       Reply  Wed Sep 17 15:40:00 2014, ericq, Update, LSC, DRMI locking dcAngleDiff_srcL.pdfdrfpmiVertexSensing.zip
          Reply  Tue Sep 23 17:37:10 2014, ericq, Update, LSC, DRMI locking SRCcorrection.pdf
             Reply  Wed Sep 24 11:02:38 2014, manasa, Update, LSC, Moving SRM 
                Reply  Thu Sep 25 11:33:41 2014, Jenne, Update, LSC, POY alignment laser 
Message ID: 10531     Entry time: Wed Sep 24 11:02:38 2014     In reply to: 10527     Reply to this: 10538
Author: manasa 
Type: Update 
Category: LSC 
Subject: Moving SRM 

I looked at the CAD layout and it seems like we will clearly be clipping POY if we move SRM by 7.5cm. Since POY is not visible at low power, we cannot be sure about the clipping.

We should have a plan B before we move everything. I suggest we move a combination of SRM and SR2 to get the desired SRC length.
Moving SR2 will require extra effort to walk the beam unclipped through all the 6 output steering mirrors that follow; but there will be little room for error if we use irides to propagate the beam through the first 4 mirrors that are in the BS and ITMY chamber.