Fri Sep 12 00:40:23 2014, Jenne, Update, LSC, DRMI locking
|
Fri Sep 12 11:25:42 2014, Koji, Update, LSC, DRMI locking
|
Fri Sep 12 12:00:59 2014, ericq, Update, LSC, DRMI locking
|
Fri Sep 12 14:11:17 2014, ericq, Update, LSC, DRMI locking 7x
|
Wed Sep 17 15:40:00 2014, ericq, Update, LSC, DRMI locking 
|
Tue Sep 23 17:37:10 2014, ericq, Update, LSC, DRMI locking
|
Wed Sep 24 11:02:38 2014, manasa, Update, LSC, Moving SRM
|
Thu Sep 25 11:33:41 2014, Jenne, Update, LSC, POY alignment laser
|
|
Message ID: 10531
Entry time: Wed Sep 24 11:02:38 2014
In reply to: 10527
Reply to this: 10538
|
Author: |
manasa |
Type: |
Update |
Category: |
LSC |
Subject: |
Moving SRM |
|
|
I looked at the CAD layout and it seems like we will clearly be clipping POY if we move SRM by 7.5cm. Since POY is not visible at low power, we cannot be sure about the clipping.
We should have a plan B before we move everything. I suggest we move a combination of SRM and SR2 to get the desired SRC length.
Moving SR2 will require extra effort to walk the beam unclipped through all the 6 output steering mirrors that follow; but there will be little room for error if we use irides to propagate the beam through the first 4 mirrors that are in the BS and ITMY chamber. |