40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log  Not logged in ELOG logo
Entry  Fri Aug 22 18:05:02 2014, Andres, Update, IMC, Upgrade of the IMC WFSs for the reflection ModeCleanerUpgrade.PNG
    Reply  Mon Aug 25 09:56:21 2014, Steve, Update, IMC, IMC WFSs upgrade eq6Mnapa.png
    Reply  Tue Aug 26 23:46:55 2014, ericq, Update, IMC, WFS tuneup newWFSmatrix.pdf
       Reply  Wed Aug 27 09:12:47 2014, Koji, Update, IMC, WFS tuneup 
Message ID: 10428     Entry time: Mon Aug 25 09:56:21 2014     In reply to: 10427
Author: Steve 
Type: Update 
Category: IMC 
Subject: IMC WFSs upgrade 

 

 The Napa earth quake magnitude 6 did not have any effect on the suspensions.

 The Goy phase upgrade was done nicely. The IOO pointing did not change. Credit owned to Nick and Andres.

  IFO is locked right on.

Attachment 1: eq6Mnapa.png  1.321 MB  | Hide | Hide all
eq6Mnapa.png
ELOG V3.1.3-