Plan for the week:
- PID loop design and testing with the Green laser beat note by actuating the arm cavity length.
- Beat note readout on MEDM screens and Strip tool.
- Calibration of the laser frequency response to PZT signal in MHz/V using a test DC input(Koji assigned me this task because this calibration has not been done and is very useful).
Inside the Lab:
- Placing the FOL box sometime in the afternoon today(with supervision of Manasa / EricQ).
- Calibration of the PZT(Today or tomorrow).
|